Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 32 results
-
What questions was EPA trying to find answers to during its first round of sampling at the Norwood Landfill site?
The main question that EPA seeks to answer is whether the identified waste areas warrant consideration for placement of the Site on the National Priorities List (NPL) or Superfund List. In the first round of sampling, EPA collected surface soil samples (0-2 feet) from the landfill property, and surface water…
- Last published:
-
What does it mean when EPA finds contamination that “exceeds screening levels?”
Screening levels are not the same as cleanup or action levels. An exceedance of a screening level indicates the need for additional evaluation, potentially including a site-specific risk assessment.
- Last published:
-
If EPA finds any contamination associated with the Norwood Landfill site that “exceeds” what is considered safe, will EPA clean up that contamination - even if the Agency cannot find any “pathways” for that contamination to reach humans or sensitive environments?
If the sampling data shows an exceedance of a screening level, EPA will consult with the site Toxicologist and the Agency for Toxic Substances and Disease Registry (ATSDR) to conduct a human health risk screening assessment to determine any potential threat to human health. EPA will also consult with the…
- Last published:
-
How do you know you are not missing some areas that might be contaminated?
EPA uses all credible information available, including community input, regarding the boundaries and geographic areas of waste that may have been deposited or where contaminated soil may have been placed. The team selects its sampling locations based on those areas and consults historic aerial images that help depict those boundaries.
- Last published:
-
Will EPA sample the Glenolden Laboratory property?
The former Glenolden Laboratory property located on South Avenue is a separate site. The previous owners conducted a voluntary cleanup pursuant to the Pennsylvania Department of Environmental Protection’s (PADEP) Environmental Cleanup Program, known as Act 2. Concerns regarding remedial actions conducted under Act 2 should be directed to PADEP as…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
Will EPA conduct sampling in local parks in the Norwood community?
EPA will sample Norwood Park because of its close proximity to the Old Norwood Dump and Norwood Landfill. There is no current information that would warrant sampling in other parks.
- Last published:
-
What is the timeline for posting the responses? Will we receive an email with notification on the answers or shall I monitor the website for the posting?
EPA will respond to the individual email 1 - 2 days after receipt and will post the questions and answers to the RFA website very soon thereafter.
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Is EPA planning on taking samples from the basements in the homes you are sampling in the Norwood community? If not, why not?
EPA is not planning to collect samples from residential basements or crawl spaces at this time. EPA installed six groundwater wells within the Old Norwood Dump, Norwood Lower Park, and the Winona Homes neighborhood. Groundwater wells will not be placed on private residential properties. The wells will be used to…
- Last published:
-
How are EPA’s sampling results verified for accuracy?
Samples were sent to an EPA certified laboratory for analysis. After the samples are analyzed, the data will be validated independently by chemists to verify the accuracy of the results.
- Last published:
-
Will EPA sample the Norwood school?
EPA continues to work closely with the Interboro School District, but there are no plans to sample the Norwood school at this time. For site investigations, sampling activities must be based upon the identification of a potential source of contamination. Based upon research and historic images, EPA has not seen…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published: