Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the East Palestine Train Derailment Total results: 13
- About the Cleaning Process Total results: 10
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 34 results
-
Why is the sentence incomplete on page 34 In the section about collaboration?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
How does EPA oversee cleanup at the derailment site?
EPA leads the Unified Command consisting of different agencies to approve Norfolk Southern’s workplans and weekly activities. EPA also coordinates with other agencies to perform oversight, such as with Ohio EPA, the Columbiana County Health District, and the Pennsylvania Department of Environmental Protection. EPA and Ohio EPA personnel oversee safety…
- Last published:
-
What are the health agencies doing?
The Centers for Disease Control and Prevention and Agency for Toxic Substances and Disease Registry (ATSDR) are analyzing their Assessment of Chemical Exposure (ACE) survey results to assess the health impacts of the train derailment. CDC and ATSDR continue to support the Ohio and Pennsylvania health departments and will be…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
Now that the track is rebuilt, what else needs to be done and how long will it take?
There is still a lot of work to do. Contaminated soil to the north and south of the tracks need to be removed. A full site assessment, including extensive sampling, of areas and properties near the derailment site needs to be conducted. A full assessment of impacted creeks will be…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
If there is a government shutdown, will work continue on the cleanup?
A 45-day continuing resolution was recently passed to avoid a shutdown. EPA’s emergency response efforts, such as in East Palestine, would move forward under a lapse in appropriation. As a result, EPA personnel would continue to fully support those efforts during a lapse.
- Last published:
-
What is the process for refilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
Why is Page 34 In the "data interpretation, statistical analysis and report writing, item (3) of effective plans" empty?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
How do federal and state agencies get notified of a chemical or oil spill requiring an emergency response?
By law, companies or individuals who spill hazardous chemicals or oil are required to call the National Response Center (NRC) if the quantity is above reporting limits. The NRC then notifies federal, state and local responders. Most States have additional reporting requirements that are separate from the NRC.
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
Interested in voicing your opinions and concerns related to the derailment?
A team of engineering and public affairs researchers from the University of Illinois Chicago, Cleveland State University, and Purdue University are conducting a study to understand community members’ experiences and perceptions related to water, home, and environmental impacts after the East Palestine train derailment. If you’d like to participate, sign-up…