Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Minor Repair and Maintenance Activities
- Understanding MOVES Results
- 40 CFR Part 110 Discharge of Oil Regulation
Displaying 1 - 15 of 29 results
-
To whom do I report an oil discharge?
A facility should report discharges to the National Response Center (NRC) at 1-800-424-8802 or 1-202-267-2675 . The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. If reporting directly to NRC is not practicable, reports also can be made…
- Last published:
-
When must I report an oil discharge to NRC?
Any person in charge of a vessel or an onshore or offshore facility must notify the National Response Center (NRC) immediately after he or she has knowledge of the discharge.
- Last published:
-
Why Doesn't my Output Vehicle Miles Traveled (VMT) Match my Input VMT?
See More Frequent Questions about MOVES and Related Models . This problem usually occurs when the run specification does not include all possible vehicle and fuel types. MOVES internally allocates the input VMT to each of the source types and fuel types and only reports the VMT for the fuel…
- Last published:
-
What does MOVES Assume for Future Year Fleet Fuel Efficiency and Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES reflects all fuel economy and emissions standards that were final as of the model release date. For a list of recent regulations accounted for in the most recent MOVES version, see the see the Overview of EPA’s Motor Vehicle…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
What happens after a facility submits the information about an oil discharge to EPA?
The EPA Regional Administrator will review the information submitted by the facility and may require a facility to submit and amend its SPCC Plan. Facilities and equipment that qualified for the new streamlined requirements may lose eligibility for those options as determined by the Regional Administrator. A state agency may…
- Last published:
-
Who is subject to the Discharge of Oil regulation?
Any person in charge of a vessel or of an onshore or offshore facility is subject to the reporting requirements of the Discharge of Oil regulation if it discharges a harmful quantity of oil to U.S. navigable waters, adjoining shorelines, or the contiguous zone, or in connection with activities under…
- Last published:
-
My firm installs carpets. Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is. How do I know when I need to comply with the Lead Renovation, Repair and Painting (RRP) Rule?
If when installing the carpet, you disrupt six square feet or less of painted surface per room, the job is not covered by the RRP Rule . Question Number: 23002-19749 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How does MOVES Calculate CO2 and CO2 Equivalent Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES calculates the energy it takes to operate an onroad vehicle based on energy consumption rates as explained in the technical reports Greenhouse Gas and Energy Consumption Rates for Onroad Vehicles MOVES3 (pdf) (November 2020, EPA-420-R-20-015) and Exhaust Emission Rates…
- Last published:
-
Reporting requirements for oil discharges
What are the reporting requirements for discharges of oil? If a discharge of oil reaches waters of the United States, it is reportable to the National Response Center under 40 CFR Part 110 , which was established under the authority of the Clean Water Act. Discharges of oil must be…
- Last published:
-
Why Are There No Emissions for the Early and Late Hours of the Day for Certain Source Types?
See More Frequent Questions about MOVES and Related Models . MOVES has no start emissions for the certain source types in certain hours of the day. While we know that a non-zero number of these source types do start late at night, our activity data on these trucks and buses…
- Last published:
-
Please provide guidance on how the Agency will interpret the term “minor repair and maintenance activities.”
Answer: “Minor repair and maintenance” is defined in 40 CFR 745.83 as activities that disrupt less than 6 square feet or less of painted surface per room for interior activities or 20 square feet or less of painted surface for exterior activities where none of the work practices prohibited or…
- Last published: