Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Diesel Sulfur Program
- 40 CFR Part 110 Discharge of Oil Regulation
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 19 results
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
To whom do I report an oil discharge?
A facility should report discharges to the National Response Center (NRC) at 1-800-424-8802 or 1-202-267-2675 . The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. If reporting directly to NRC is not practicable, reports also can be made…
- Last published:
-
When must I report an oil discharge to NRC?
Any person in charge of a vessel or an onshore or offshore facility must notify the National Response Center (NRC) immediately after he or she has knowledge of the discharge.
- Last published:
-
In the past, EPA has, with the assistance of industry trade associations, produced fuels brochures for use at retail outlets explaining new fuel programs and addressing performance and air quality issues. Is EPA planning a similar effort with respect to t
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In November 2005, the Clean Diesel Fuel Alliance was formed. Many public and private organizations are collaborating through the Clean Diesel Fuel Alliance to facilitate the introduction of ULSD. The U.S. Department of Energy (DOE), EPA, engine, vehicle…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
What happens after a facility submits the information about an oil discharge to EPA?
The EPA Regional Administrator will review the information submitted by the facility and may require a facility to submit and amend its SPCC Plan. Facilities and equipment that qualified for the new streamlined requirements may lose eligibility for those options as determined by the Regional Administrator. A state agency may…
- Last published:
-
Who is subject to the Discharge of Oil regulation?
Any person in charge of a vessel or of an onshore or offshore facility is subject to the reporting requirements of the Discharge of Oil regulation if it discharges a harmful quantity of oil to U.S. navigable waters, adjoining shorelines, or the contiguous zone, or in connection with activities under…
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Reporting requirements for oil discharges
What are the reporting requirements for discharges of oil? If a discharge of oil reaches waters of the United States, it is reportable to the National Response Center under 40 CFR Part 110 , which was established under the authority of the Clean Water Act. Discharges of oil must be…
- Last published:
-
A tank truck common carrier picks up a load of ULSD at a Shell terminal and delivers it to a Flying J truckstop. The carrier only provides a transportation service, does that carrier have any registration or reporting duties?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No, the carrier does not have registration or reporting duties as long as taxes were assessed (in the case of highway fuel) or dye was added (in the case of NRLM) at the terminal. There are recordkeeping and…
- Last published:
-
Will refiners produce No. 1 diesel fuel at 15 ppm sulfur? What other cold weather-gelling strategies are available to the end-user?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes, some refiners will produce No. 1 diesel fuel. There are also various other cold-flow improver additives currently on the market as well. Question and Answer was originally posted at Questions and Answers on the Clean Diesel Fuel…
- Last published:
-
Many refiners currently make a jet fuel meeting <500 ppm requirements. If refiners make a jet fuel meeting 15 ppm requirements, there may be compatibility (safety or performance) issues for jet engine manufacturers. Have these manufacturers been consulted
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The highway and nonroad diesel programs do not require that refiners produce 15 ppm sulfur jet fuel and do not set sulfur limits for jet fuel that is not designated as motor vehicle diesel fuel. This would be…
- Last published:
-
What do I need to submit to EPA if I have an oil discharge?
The owner/operator must provide the following: Name and location of the facility Owner/operator name Maximum storage/handling capacity of the facility and normal daily throughput Corrective actions and countermeasures taken, including descriptions of equipment repairs and replacements Adequate description of the facility, including maps, flow diagrams, and topographical maps, as necessary…
- Last published:
-
What information do I need to report for an oil discharge?
The National Response Center (NRC) will ask a caller to provide as much information about the incident as possible including: • Name, organization, and telephone number • Name and address of the party responsible for the incident • Date and time of the incident • Location of the incident •…
- Last published:
-
If a terminal imports off-spec kerosene (higher than 15 ppm), terminal operators are planning to blend the kerosene with diesel fuel so that the ultimate diesel fuel leaving the terminal gate and entering into commerce meets the 15 ppm standard.
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The regulations at § 80.525(d) state that kerosene that a kerosene blender adds, or intends to add, to motor vehicle diesel fuel subject to the 15 ppm sulfur standard must meet the 15 ppm sulfur standard. Section 80.521(b)…
- Last published: