Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Prior to Cleaning Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Gasoline Sulfur Program Total results: 17
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 28 results
-
What is the Tier 2 Vehicle & Gasoline Sulfur Program?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The Tier 2 Vehicle and Gasoline Sulfur Program is a landmark program, begun in January 2004, that affects every new passenger vehicle and every gallon of gasoline sold in the U.S. By designing cleaner cars that run on…
- Last published:
-
Can a refiner or importer use gasoline sulfur test methods other than ASTM D 2622-98, especially for sulfur levels of 10 ppm and less?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The rule designates ASTM D 2622 as the benchmark test method by which compliance will be determined, and that is the test that the Agency typically will use in establishing compliance. However, the rule does permit alternative test…
- Last published:
-
There is significant difference between "refiner" and "refinery". Portions of the regulations use "refiner" where "refinery" is the appropriate term. While it may be clear from the context that "refinery" is meant, text should be changed to avoid any poss
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . We agree with the comment and intend to make these clarifications in a future rulemaking. These clarifications would not affect the regulatory requirements in the current final rule.
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
What do I have to do in preparation for the cleaning?
Cleaning crews will not move any of your personal belongings, including furniture or appliances. To ensure the most thorough cleaning of your home or place of business, please clear countertops and other surfaces, and limit excess clutter. Norfolk Southern will provide a few boxes if needed to allow for easy…
- Last published:
-
Must a refinery that produces both California gasoline and federal RFG designate each batch produced as either federal RFG or California gasoline, and maintain segregation of both products, even though the gasoline meets the requirements of both programs?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.375(c) requires that each batch of California gasoline be designated as such by the refiner or importer, and that California gasoline be segregated from gasoline that is not California gasoline at all points in the distribution system…
- Last published:
-
Truckers may obtain both premium gasoline and regular gasoline from a terminal in order to supply a retail outlet with midgrade gasoline. In such cases, if a truck obtains a load of gasoline from a terminal that consists of a mixture of gasoline from a te
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The regulation specifically exempts gasoline in trucks from the testing requirement for S-RGAS, and instead allows truckers to rely on the test result of the terminal supplying the truck carrier. See § 80.210(d)(4). Where a tanker truck receives…
- Last published:
-
Section 80.46(a) was amended by the rule to require the use of ASTM D-3246 to determine the sulfur content of butane. Many refiners and butane suppliers do not currently use that method. Requiring a new method prior to the 2004 effective date of the gasol
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The final gasoline sulfur rulemaking amended 40 CFR § 80.46(a) to require the use of ASTM D 3246-96 to determine the sulfur content of butane. We did not intend to require the use of this new test method…
- Last published:
-
Can butane blenders generate allotments and credits?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.340(b)(1) provides that butane blenders may comply with the gasoline sulfur rule sampling and testing requirements using test results from the butane supplier provided that certain requirements are met. One requirement is that the sulfur content of…
- Last published:
-
Does the gasoline sulfur rule require refiners and downstream parties to account for the sulfur content of a registered fuel additive, such as a corrosion inhibitor used to help prevent sulfur-related fuel gauge sending unit failures?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Currently, there is no requirement under the gasoline sulfur rule for refiners or downstream parties to demonstrate compliance with the gasoline sulfur standards for registered fuel additives. Parties who add fuel additives, however, are responsible for ensuring that…
- Last published:
-
Section 80.335(a)(2) requires refiners to retain sample portions for the most recent 20 samples collected, or for each sample collected during the most recent 21 day period, whichever is greater. Is a refinery that produces only one or two batches of gaso
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The cited section of the regulation specifies the minimum number of batch samples from a refinery, which once created, must be maintained (twenty). The regulation does not specifically address the maximum amount of time that any particular sample…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
A refiner produces a batch of gasoline at its refinery. It collects a sample of the gasoline and conducts certification testing. The sulfur content test result is less than the 80 ppm refinery level standard. The gasoline is then moved to another tank wit
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The downstream standard applies to samples of gasoline subsequent to movement of the gasoline from the tank in which certification sampling is conducted, even when these subsequent samples are collected within the refinery or import facility where the…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published: