Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Formaldehyde Total results: 1
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Registration Total results: 9
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 18 results
-
In a situation where an importer leases tankage from another company, e.g., from a for-hire terminal, who must register such import facility, the company that owns the terminal, the importer that leases the tankage, or both?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.2(r), an importer is defined as "a person who imports gasoline or gasoline blending stocks or components from a foreign country into the United States...." Accordingly, it is the importer of the gasoline, and not the…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Once I register my fuel for the RFS2 program under §80.1450, do I still need to register my fuel under 40 CFR Part 79?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Renewable fuels intended for use or used in motor vehicles are required to be registered under 40 CFR part 79 prior to any introduction into commerce. Manufacturers of renewable fuels and fuel additives not registered under part…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Does EPA consider it a conflict of interest for a third-party company to assist a group of renewable fuel producers and importers of renewable fuel to help meet the requirements of the re-registration and engineering review pursuant to section 80.1450?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA does not restrict a renewable fuel producer or an importer of renewable fuel from seeking a third-party company to assist them in meeting the re-registration and engineering review requirements pursuant to section 80.1450. The renewable fuel producer…
- Last published:
-
Will common carriers be required to register their transport trucks as oxygenate blending facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Normally, only the owner of the gasoline produced at an oxygenate blending operation must register as an oxygenate blender. If a common carrier blends gas in trucks that it owns it must meet all of the requirements for…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
If an importer registers in a PADD, may the importer use a starting point other than zero, within the range of valid batch numbers, for generating the sequential batch numbers at each of its import facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. As long as no batches are assigned duplicate numbers this would be acceptable.(7/1/94) This question and answer was posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997…
- Last published:
-
If an importer is unsure of what terminals might be involved in importing gasoline (RFG or conventional), may importers register more terminals than might be used?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. However, an importer does not need to register each import facility it uses (see previous question).(7/1/94) This question and answer was posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through…
- Last published:
-
Is formaldehyde a contaminant of concern from the derailment?
Last week, an East Palestine resident reported to EPA that they had a skin reaction from handling soil in their backyard after digging a swimming pool. EPA tested the soil and did not detect high hazard chemicals. The device used for testing did indicate that low levels of formaldehyde might…
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…
- Last published:
-
PE certifying an SPCC plan in a different state
Except as provided in 40 CFR §112.6 for qualified facilities, a licensed Professional Engineer (PE) must review and certify an SPCC Plan for it to be effective to satisfy the requirements of Part 112 (§112.3(d)). When reviewing and certifying a facility’s SPCC Plan, must the PE be licensed in the…
- Last published: