Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable Biomass Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 18 results
-
What are the recordkeeping requirements for a renewable fuel producer that uses used cooking oils and fats as feedstocks for renewable fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Renewable fuel producers using used cooking oils or animal wastes as feedstocks are required under 40 CFR 80.1454(d)(3) to obtain from their feedstock supplier, and maintain in their records, documents which certify that the feedstock meets the definition…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
What materials from non-federal forestlands meet the definition of renewable biomass in RFS?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Slash and pre-commercial thinnings from non-federal forestland that is not ecologically sensitive forestland qualify as renewable biomass for purposes of RFS. Slash is defined in 40 CFR 80.1401 as the residue, including treetops, branches and bark, left on…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
How does the "active management" requirement in the definition of renewable biomass apply to land that changes status in the future?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In RFS2, EPA has interpreted the EISA requirement that existing agricultural land be "cleared or cultivated at any time prior to [December 19, 2007] and actively managed or fallow and nonforested" to apply to land that existed as…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
Does a renewable fuel producer have to report and maintain records on the feedstocks for every batch of renewable fuel they produce?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . All renewable fuel producers must report and maintain records concerning the type and amount of feedstocks used for each batch of renewable fuel produced (see 80.1451(b)(1)(ii)(K) and 80.1454(b)(3)(vi)). With regard to the renewable biomass recordkeeping and reporting requirements…
- Last published:
-
How does a renewable fuel producer document that the MSW feedstock that they are using to produce cellulosic ethanol meets the definition of separated MSW as defined in Section 80.1426(f)(5)(i)(C )? How does the producer quantify the portion of the final
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The renewable fuel producer using separated MSW feedstock to produce renewable fuels such as cellulosic ethanol, cellulosic diesel, cellulosic naphtha, etc. must document that their feedstock meets the definition of separated municipal solid waste (MSW), which is "material…
- Last published:
-
How does the "active management" requirement in the definition of renewable biomass apply to land that changes status in the future?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In RFS2, EPA has interpreted the EISA requirement that existing agricultural land be "cleared or cultivated at any time prior to [December 19, 2007] and actively managed or fallow and nonforested" to apply to land that existed as…
- Last published:
-
Are palm oil plantations considered agricultural land or tree plantations under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Palm oil trees are planted and managed for the purpose of harvesting palm fruit and not for harvesting the trees themselves, in the same way that a fruit orchard is planted and managed to yield fruit and not…
- Last published:
-
How will waste from the Further Remedial Elements project (Silver Bow Creek Corridor) areas be handled?
Each Further Remedial Element project area has its own specific requirements regarding waste. For example, at Northside Tailings and Diggings East, all materials within the project area that exceed the Waste Identification Criteria will be disposed of offsite in a repository. At Buffalo Gulch all materials below the basin(s) that…
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…
- Last published:
-
PE certifying an SPCC plan in a different state
Except as provided in 40 CFR §112.6 for qualified facilities, a licensed Professional Engineer (PE) must review and certify an SPCC Plan for it to be effective to satisfy the requirements of Part 112 (§112.3(d)). When reviewing and certifying a facility’s SPCC Plan, must the PE be licensed in the…
- Last published: