Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 16 results
-
What is EPA doing?
EPA is working with its governmental partners and other stakeholders to investigate and address the issue. Most recently, EPA issued a letter to the state of Minnesota requesting a plan of action to address nitrate contamination in drinking water.
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Why are gloves, which are exposed to large amounts of lead dust, not required to be disposed of under the Lead Renovation, Repair and Painting (RRP) Rule?
The RRP Rule requires the renovation firm to use precautions to ensure that all personnel, tools, and other items are free of dust and debris before leaving the work area. Workers with contaminated clothing can take that contamination home to their own children, and taking contaminated equipment to another jobsite…
- Last published:
-
How do I have my drinking water tested in the future?
Minnesota Department of Health (MDH) recommends you use an accredited laboratory to test your water. Contact an accredited laboratory to get sample containers and instructions or ask your county environmental or public health services if they provide well testing services. Accredited Labs in Minnesota Accepting Drinking Water Samples from Private…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
How should lead-containing wastes from RRP renovations be handled and disposed?
While at the work site, wastes must be collected at the conclusion of each work day and at the conclusion of the renovation and stored under containment, in an enclosure, or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published:
-
Can non-certified workers transport debris off site under the RRP Rule if they have had documented on-the-job training in this activity by the certified renovator?
Answer: Yes. The RRP Rule requires the certified renovator to regularly direct the work being performed by other individuals to ensure that the work practices are being followed, including ensuring that dust or debris does not spread beyond the work site. The certified renovator is responsible for providing training to…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, how should I dispose of contaminated water used in two-bucket mopping?
EPA recommends contacting your local water treatment authority and asking about local requirements for handling and disposing of waste water. Question Number: 23002-20756 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…
- Last published:
-
PE certifying an SPCC plan in a different state
Except as provided in 40 CFR §112.6 for qualified facilities, a licensed Professional Engineer (PE) must review and certify an SPCC Plan for it to be effective to satisfy the requirements of Part 112 (§112.3(d)). When reviewing and certifying a facility’s SPCC Plan, must the PE be licensed in the…
- Last published:
-
How did EPA amend the requirements for animal fats and vegetable oils in 2006?
In December 2006, EPA removed the following SPCC requirements for the following specific types of animal fat and vegetable oil facilities: Requirements for onshore oil production facilities (Section 112.13) Requirements for onshore oil drilling and workover facilities (Section 112.14) Requirements for offshore oil drilling, production, or workover facilities (Section 112.15)…
- Last published:
-
Rainwater in containment system of SPCC regulated farm
What do I do with rainwater that accumulates in my containment system for a farm regulated by the Spill Prevention, Control, and Countermeasure (SPCC) rule? Check the rainwater for any oil, and if no oil is present, this can be released. If there is oil in the water, this water…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, what type of container is adequate for on-site storage of debris?
At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published: