Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the East Palestine Train Derailment Total results: 13
- About the Cleaning Process Total results: 10
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 21 results
-
How does EPA oversee cleanup at the derailment site?
EPA leads the Unified Command consisting of different agencies to approve Norfolk Southern’s workplans and weekly activities. EPA also coordinates with other agencies to perform oversight, such as with Ohio EPA, the Columbiana County Health District, and the Pennsylvania Department of Environmental Protection. EPA and Ohio EPA personnel oversee safety…
- Last published:
-
What are the health agencies doing?
The Centers for Disease Control and Prevention and Agency for Toxic Substances and Disease Registry (ATSDR) are analyzing their Assessment of Chemical Exposure (ACE) survey results to assess the health impacts of the train derailment. CDC and ATSDR continue to support the Ohio and Pennsylvania health departments and will be…
- Last published:
-
Now that the track is rebuilt, what else needs to be done and how long will it take?
There is still a lot of work to do. Contaminated soil to the north and south of the tracks need to be removed. A full site assessment, including extensive sampling, of areas and properties near the derailment site needs to be conducted. A full assessment of impacted creeks will be…
- Last published:
-
If there is a government shutdown, will work continue on the cleanup?
A 45-day continuing resolution was recently passed to avoid a shutdown. EPA’s emergency response efforts, such as in East Palestine, would move forward under a lapse in appropriation. As a result, EPA personnel would continue to fully support those efforts during a lapse.
- Last published:
-
What is the process for refilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
How do federal and state agencies get notified of a chemical or oil spill requiring an emergency response?
By law, companies or individuals who spill hazardous chemicals or oil are required to call the National Response Center (NRC) if the quantity is above reporting limits. The NRC then notifies federal, state and local responders. Most States have additional reporting requirements that are separate from the NRC.
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Interested in voicing your opinions and concerns related to the derailment?
A team of engineering and public affairs researchers from the University of Illinois Chicago, Cleveland State University, and Purdue University are conducting a study to understand community members’ experiences and perceptions related to water, home, and environmental impacts after the East Palestine train derailment. If you’d like to participate, sign-up…
- Last published:
-
There is mud on my car from driving on Taggart Street. Is this contaminated?
No, all site vehicles are washed and cleaned before leaving the operational areas. Vehicles carrying contaminated soil are tightly covered and checked before entering Taggart. Street sweepers clean dust and residual dirt from the surrounding roads, so any mud would not be from contaminated areas.
- Last published:
-
Why are there new water pipes being installed and hydrants open in town?
The East Palestine Water Department recently started a water main and lead service line replacement program that will continue through spring 2024. This is not related to the train derailment but is a long-term project that has been in the planning stages for a few years. Work is completed on…
- Last published:
-
Can I go visit the derailment site?
No. The site will remain closed to the public until work is completed for health and safety reasons. If you missed our “Track Talk” information session on May 18, the session showed a video and several photos of progress at the site.
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…