Search Frequent Questions
Filter By:
- Southeast Minnesota Groundwater Total results: 11
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
Displaying 1 - 15 of 33 results
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Will boiling my water help?
No. Boiling water will NOT reduce nitrate levels. In fact, it will make the level of nitrate worse because some of the water will evaporate but the nitrate will not. This increases the concentration of nitrate in water.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
Is it safe to shower or bathe in water if it is over the nitrate MCL of 10 mg/L?
Nitrate is only a concern for ingestion (eating and drinking). It is not absorbed through your skin. People who install filter systems for nitrate often install them just for their kitchen sink faucet, and they use that faucet for their cooking and drinking water.
- Last published:
-
What is EPA doing?
EPA is working with its governmental partners and other stakeholders to investigate and address the issue. Most recently, EPA issued a letter to the state of Minnesota requesting a plan of action to address nitrate contamination in drinking water.
- Last published:
-
What should I do if my water has elevated nitrates and/or exceeds the MCL?
If nitrate exceeds the MCL of 10 mg/L, you should find a safe alternative drinking water supply. The quickest thing to do is to begin using bottled water for drinking. Another option is to install a treatment that will remove nitrate from your water such as reverse osmosis or a…
- Last published:
-
Why is nitrate contamination a concern?
Nitrate is an acute contaminant, meaning that health effects can occur immediately (I.e. within hours or days) of short-term exposure. Too much nitrate in your body makes it harder for red blood cells to carry oxygen. While most people recover quickly, this can be very dangerous for infants and some…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
The authorship of the proposal can be co-written and co-submitted by a coalition. However, how can organizations document the budget? Do coalitions complete several line items budget for each of the members of the coalition and a budget narrative tying them all together? Do coalition members submit one line-item budget and all the coalition members who are not the PR will have a single item listed in the “other” category?
There should be one detailed budget narrative covering the entire project. Whoever is submitting the proposal and responsible for managing the agreement would provide their budget and all the object class categories that you are used too: personal, fringe, travel, equipment, supplies, contracting, and other. The other coalition members, if…
- Last published: