Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Recordkeeping and Reporting Requirements Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
-
Renovations Covered by the RRP Rule
Total results: 84
- In General Total results: 9
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 22 results
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are the NO Values in the MOVES Output Files Actually NO (Molecular Weight 30), or is the NO Expressed as NO2 (Molecular Weight 46)?
See More Frequent Questions about MOVES and Related Models . The NO values in all versions of MOVES2014 (and MOVES2010b) output files are expressed as NO2 (molecular weight 46). HONO and NOx are also expressed in terms of NO2.
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
My firm repairs windows by removing and replacing the sash. We may disturb paint on the hinges and screws, but do not otherwise disturb a painted surface. Is this work subject to the Lead Renovation, Repair and Painting (RRP) Rule?
Replacement of a window sash by simply unscrewing hinges or releasing it from a jambliner does not constitute "window replacement" for purposes of the RRP Rule . Therefore, such tasks may fit within the definition of minor repair and maintenance i.e., activities that disturb six square feet or less of…
- Last published:
-
What is the Difference Between Extended Idling and Normal Idling? Is it Possible to get Distinct Idling Emission Output for any Vehicle Type? Can this be Done in the Emission Rate Mode, or only Inventory Mode?
See More Frequent Questions about MOVES and Related Models . Extended idling is a distinct emission process defined as the overnight idling of long-haul trucks with sleeper cabs at truck stops and other locations during federally required downtime. During such idling periods, these engines experience unusual loads (televisions, air conditioning…
- Last published:
-
How does MOVES Classify Light-Duty Trucks?
See More Frequent Questions about MOVES and Related Models . There are two definitions used in MOVES for light duty trucks. The source use type light duty trucks (sourceTypeID values of 31 or 32) use the Federal Highway Administration (FHWA) VM-1 definition of light duty vehicles used to report vehicle…
- Last published:
-
Does the RRP Rule apply to renovations that disturb ceramic tile where the glaze on the tile contains lead at regulated levels?
No. Ceramic tile glaze is neither a surface coating nor a painted surface. Therefore, renovations that disturb ceramic tile glaze are not subject to the RRP Rule. Question Number: 23002-15691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Under the RRP Rule, can the certified renovator comply with the rules by keeping records regarding his certification and employee training electronically, provided he can display them on a hand held device or laptop on the job site?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule does not specify the format in which these documents must be kept, but they must be available at the work site. Documents are not available if they cannot be viewed. Certified renovators must have with them at the work site copies…
- Last published:
-
What is the Relationship Between Calendar Year, Model Year, and Age?
See More Frequent Questions about MOVES and Related Models . Model year (modelYearID) corresponds to the year that a group of vehicles in the fleet was produced. Calendar year (yearID) is the analysis year as selected in the ‘Time Spans/Year’ panel of the MOVES GUI. For a given calendar year…
- Last published: