Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Emergency Renovations Total results: 5
- Testing Painted Components Total results: 6
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 18 results
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Are the NO Values in the MOVES Output Files Actually NO (Molecular Weight 30), or is the NO Expressed as NO2 (Molecular Weight 46)?
See More Frequent Questions about MOVES and Related Models . The NO values in all versions of MOVES2014 (and MOVES2010b) output files are expressed as NO2 (molecular weight 46). HONO and NOx are also expressed in terms of NO2.
- Last published:
-
Does the RRP rule apply to contractors working on homes damaged by a hurricane or other natural disaster?
Damage from a major storm or other natural disaster could result in the need for emergency renovations. Certain requirements of the RRP Rule do not apply to emergency renovations, which are renovation activities that were not planned but result from a sudden, unexpected event that, if not immediately attended to…
- Last published:
-
If a certified inspector or risk assessor determines that a component was installed post-1978 and is therefore free of lead-based paint, can the renovation firm rely on this determination?
Yes, as long as the renovation firm has obtained a copy of the determination. The firm must retain a copy of the determination for three years after completion of the renovation. Question Number: 23002-18218 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
What is the Difference Between Extended Idling and Normal Idling? Is it Possible to get Distinct Idling Emission Output for any Vehicle Type? Can this be Done in the Emission Rate Mode, or only Inventory Mode?
See More Frequent Questions about MOVES and Related Models . Extended idling is a distinct emission process defined as the overnight idling of long-haul trucks with sleeper cabs at truck stops and other locations during federally required downtime. During such idling periods, these engines experience unusual loads (televisions, air conditioning…
- Last published:
-
How does MOVES Classify Light-Duty Trucks?
See More Frequent Questions about MOVES and Related Models . There are two definitions used in MOVES for light duty trucks. The source use type light duty trucks (sourceTypeID values of 31 or 32) use the Federal Highway Administration (FHWA) VM-1 definition of light duty vehicles used to report vehicle…
- Last published:
-
Is a lead-based paint inspection sufficient to determine compliance with requirements of the RRP rule?
Question: Is a lead-based paint inspection, performed by a certified inspector or risk assessor, that includes a written determination that various building components are free of paint or other surface coatings containing lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight sufficient…
- Last published:
-
When testing a property for the presence of lead prior to beginning a renovation using an EPA-recognized lead test kit, must I test every component affected by the renovation?
Answer: Yes. Because certified renovator training does not cover sampling protocols, certified renovators using EPA-recognized lead test kits or performing paint chip sampling to determine the applicability of the RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does…
- Last published:
-
What is the Relationship Between Calendar Year, Model Year, and Age?
See More Frequent Questions about MOVES and Related Models . Model year (modelYearID) corresponds to the year that a group of vehicles in the fleet was produced. Calendar year (yearID) is the analysis year as selected in the ‘Time Spans/Year’ panel of the MOVES GUI. For a given calendar year…
- Last published:
-
I am an owner/agent for an apartment community built prior to 1978. In 2004, testing of a random sample of units were negative for lead paint but positive for lead dust. With the positive lead dust result, are we required to comply with the RRP Rule?
No. As long as the determination that the units are free of lead-based paint was made by an inspector or risk assessor certified by EPA or by an authorized State or Tribal program, renovations in the building are not covered by the Lead Renovation, Repair, and Painting (RRP) Rule…
- Last published:
-
If a property is tested by a certified renovator, inspector, or risk assessor and found to be free of lead-based paint, does any testing need to be done again if work is done on the property several years later?
Where a certified renovator uses an EPA-recognized lead test kit or performs paint chip sampling to determine that a component is free of lead-based paint, or a lead-based paint free determination is made by a certified inspector or risk assessor, firms performing renovations on the same components may rely on…
- Last published:
-
What is the Meaning of the MOVESScenarioID Field? What Conditions Must User-Defined MOVESScenarioIDs Meet?
See More Frequent Questions about MOVES and Related Models . The MOVESScenarioID is merely text that is used to label the output rows resulting from a MOVES rates run and is defined in the Scale Panel of the MOVES GUI. You can enter any text you like, as long as…
- Last published:
-
How are the Number of Weekdays and Weekend Days in each Month Determined in MOVES?
See More Frequent Questions about MOVES and Related Models . For any given month, MOVES assumes that 5 out of every 7 days in the month are ‘weekdays’ and 2 out of every 7 of days in the month are ‘weekend days.’ For example, MOVES assumes that January has (5/7)*31…
- Last published:
-
What is Vehicle Specific Power (VSP)?
See More Frequent Questions about MOVES and Related Models . It is an estimate of the power demand on the engine during driving. It is calculated using the second-by-second speed values in a driving schedule, along with information about the type of vehicle being operated. The VSP is used by…
- Last published:
-
I’m a certified renovator using an EPA-recognized lead test kit to determine whether or not I have to follow the Lead Renovation Repair and Painting (RRP) Rule lead-safe work practices. What components must test negative for lead-based paint in order to qualify for the exclusion in 40 CFR 745.82(a)(2)?
Generally, a certified renovator using an EPA-recognized lead test kit must test each building component to be disturbed. The only exception to this requirement is when the components make up an integrated whole. In such a case, one or more component(s) may represent a system of components, unless it is…
- Last published: