Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Prior to Cleaning Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 18 results
-
In the past, EPA has, with the assistance of industry trade associations, produced fuels brochures for use at retail outlets explaining new fuel programs and addressing performance and air quality issues. Is EPA planning a similar effort with respect to t
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In November 2005, the Clean Diesel Fuel Alliance was formed. Many public and private organizations are collaborating through the Clean Diesel Fuel Alliance to facilitate the introduction of ULSD. The U.S. Department of Energy (DOE), EPA, engine, vehicle…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
What do I have to do in preparation for the cleaning?
Cleaning crews will not move any of your personal belongings, including furniture or appliances. To ensure the most thorough cleaning of your home or place of business, please clear countertops and other surfaces, and limit excess clutter. Norfolk Southern will provide a few boxes if needed to allow for easy…
- Last published:
-
A tank truck common carrier picks up a load of ULSD at a Shell terminal and delivers it to a Flying J truckstop. The carrier only provides a transportation service, does that carrier have any registration or reporting duties?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No, the carrier does not have registration or reporting duties as long as taxes were assessed (in the case of highway fuel) or dye was added (in the case of NRLM) at the terminal. There are recordkeeping and…
- Last published:
-
If a facility is grandfathered, is it also exempt from the requirement that feedstocks must be renewable biomass?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Even if a facility is exempt from the 20% GHG reduction requirement, in order to generate RINs, the facility is still required to use feedstocks that meet the definition of renewable biomass. The definition of renewable fuel in…
- Last published:
-
Will refiners produce No. 1 diesel fuel at 15 ppm sulfur? What other cold weather-gelling strategies are available to the end-user?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes, some refiners will produce No. 1 diesel fuel. There are also various other cold-flow improver additives currently on the market as well. Question and Answer was originally posted at Questions and Answers on the Clean Diesel Fuel…
- Last published:
-
Many refiners currently make a jet fuel meeting <500 ppm requirements. If refiners make a jet fuel meeting 15 ppm requirements, there may be compatibility (safety or performance) issues for jet engine manufacturers. Have these manufacturers been consulted
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The highway and nonroad diesel programs do not require that refiners produce 15 ppm sulfur jet fuel and do not set sulfur limits for jet fuel that is not designated as motor vehicle diesel fuel. This would be…
- Last published:
-
Are Canadian facilities included in the grandfathering provision? Does the grandfathering provision extend to facilities that commenced production up to December 31, 2009?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The grandfathering provisions apply equally to facilities inside and outside the RFS program area. Facilities that commenced construction (as defined in §80.1403(a)(4)) prior to December 19, 2007, and which satisfy the timely construction requirements of §80.1403(c)(1) and (2)…
- Last published:
-
Will someone explain the process to me so that I can decide if I want cleaning?
During your pre-cleaning interview, representatives from EPA and Norfolk Southern will explain the cleaning process, assess time and resource needs, answer questions, and if desired schedule a cleaning date.
- Last published:
-
If a terminal imports off-spec kerosene (higher than 15 ppm), terminal operators are planning to blend the kerosene with diesel fuel so that the ultimate diesel fuel leaving the terminal gate and entering into commerce meets the 15 ppm standard.
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The regulations at § 80.525(d) state that kerosene that a kerosene blender adds, or intends to add, to motor vehicle diesel fuel subject to the 15 ppm sulfur standard must meet the 15 ppm sulfur standard. Section 80.521(b)…
- Last published:
-
Table 1 in 80.1426 does not include a coal fired ethanol plant. If a coal fired plant can be demonstrated as "grandfathered-in," can we assume the ethanol produced will have a D code of 6?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Per 80.1403(c), all facilities (including coal-fired facilities) for which construction commenced prior to December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction may qualify for grandfathered status regardless of the…
- Last published: