Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Other Total results: 6
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Renovator Certification and Training Total results: 12
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 49 results
-
Please clarify whether oxygenates blended into either conventional gasoline or Reformulated Blendstock for Oxygenate Blending (RBOB) downstream of the refinery need to be included in sulfur compliance calculations.
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.205(c) provides that a refiner or importer may include oxygenates added downstream from the refinery or import facility if the requirements under § 80.69(a) or § 80.101(d)(4)(ii) of the RFG/CG regulations are met. Therefore, a refiner or…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Could an organization in the coalition be a Project Subrecipient if there is a conflict-of-interest policy in place?
Full Question If we develop a conflict-of-interest policy and require recusal from evaluating or prioritizing projects where a conflict arises, would this allow EJ orgs to submit projects for funding even if they are getting paid to advise on the structure and process for the re-grant program and participation in…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published:
-
Is there an expectation on whether small subawards, for ~ $50K, or large subawards, for ~$750K are preferable? For example, a large subaward could be the only thing a regional PR could award if they ask for the minimum of $2,000,000.
The RFA does not state a preference for the size of the subaward, so long as the subaward is within the $50,000 to $750,000 limit. GLNPO will look to applicants to describe the program to be carried out and why this amount of subaward funding makes sense for their specific…
- Last published:
-
Can renovator training courses, both initial and refresher courses, be taught online or via distance learning?
Answer: The final Renovation, Repair and Painting regulation, like the abatement program, permits the use of alternative training techniques (e.g., video training, computer-based training) as a supplement to the hands-on skills assessment, or as a substitute for the lecture portion of the training course requirements outlined in § 745.225. In…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is the certified renovator assigned to a specific project responsible for the work practices of other contractors on the project if the certified renovator is an employee of the general contractor of the project?
All firms performing renovations must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator. A firm acting as a general contractor may satisfy this requirement by hiring another certified firm that takes responsibility for ensuring…
- Last published:
-
What about a situation where the homeowner is acting as their own general contractor and hires multiple companies to do different portions of the work? In this situation, would each business participating be required to follow the rules and assign a separate certified renovator to supervise their portion of the work including separate containment?
Answer: While the homeowner may be performing the role of general contractor by hiring firms and organizing their work, the homeowner is not performing, offering, or claiming to perform a renovation and therefore does not need to be a certified firm. The firms hired by the homeowner to perform renovation…
- Last published:
-
The certified renovator is required to have proof of their certification at the work site. If the certified renovator provides on-the-job training to workers, does there need to be documentation of that training at the work site too?
Answer: No. Certified renovators must have with them at the work site copies of their initial course completion certificate and their most recent refresher course completion certificate. Certified renovators are also responsible for providing training to non-certified workers on the work practices they will be using in performing their assigned…
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
Can letters of support be emailed directly to EPA?
Only materials submitted as part of the grant application submitted on Grants.gov will be considered. If supporters wish to send letters directly to EPA, they may email ( [email protected] ). However, for them to be considered with the application, the applicant organization should be copied on those email messages with…
- Last published:
-
In the NPRM, the sulfur standards were expressed without decimal places, but the final rule provides that the standards are expressed with two decimal places (§§ 80.195, 205). Why did EPA include this change?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA included the decimal places to ensure that the sulfur standards are not exceeded by rounding down actual average sulfur levels. We do not believe reporting the average sulfur level to two decimals creates any additional burden as…
- Last published: