Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Registration and Reporting under 40 CFR 79 Total results: 19
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Lead-Based Paint Program Fees Total results: 9
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Registration and Reporting under 40 CFR 79
- Lead-Based Paint Program Fees
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 31 results
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
Does the Fee Rule for Abatement and RRP Programs apply nationwide?
Answer: The rule applies only in those states and tribes without their own authorized lead programs. Currently, EPA implements the Lead-based Paint Activities program in 11 states and the Lead Renovation, Repair, and Painting Rule in 36 states. Question Number: 23002-33305 Find a printable PDF copy of all frequent questions…
- Last published:
-
Who is affected by the Fee Rule for Lead Abatement and Renovation, Repair and Painting (RRP) Programs?
The Fee Rule for Lead Abatement and RRP Programs establishes fees that will be charged for training programs seeking accreditation, for firms engaged in renovations seeking certification and for individuals (for example, risk assessors) or firms engaged in lead-based paint activities that govern lead abatement, inspection and risk assessment activities…
- Last published:
-
How do I register renewable gasoline?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Manufacturers/importers of renewable gasoline for on-road use are required to register the fuel with the EPA. To register, see: Register or Update a Fuel or Fuel Additive Request under 40 CFR Part 79 . Please indicate “renewable gasoline”…
- Last published:
-
Where can I find the public list of registered fuels and fuel additives?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . An online list of fuels and fuel additives registered with EPA is located here: Register or Update a Fuel or Fuel Additive Request under 40 CFR Part 79 .
- Last published:
-
How do I register renewable diesel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Manufacturers/importers of renewable diesel for on-road use are required to register the fuel with the EPA. To register, see Register or Update a Fuel or Fuel Additive Request under 40 CFR Part 79 . Please indicate “renewable diesel”…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
When do I get an EPA assigned fuel ID/additive ID?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . You will receive your assigned ID after registering your fuel and/or fuel additive with EPA.
- Last published:
-
Where can I get more information on the Fee Rule for Lead Abatement and Lead Renovation, Repair and Painting (RRP) Programs?
Answer: You can find fee rule information at Lead Renovation, Repair and Painting Program Rules . You can also contact the National Lead Information Center at 1-800-424-LEAD . Question Number: 23002-33298 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Which fuels require registration?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under Part 79, manufacturers and importers of gasoline and diesel fuels for use in a motor vehicle or additives for such gasoline or diesel fuel are required to register them with the EPA prior to sale.
- Last published:
-
We are a marketer of ethanol products. Sometimes personnel at ethanol plants make mistakes as to the number of gallons being loaded or produced. How do we "recall" erroneous RINs if the number of gallons we receive exceeds the number of RINs?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . PTD documents may be corrected to reflect the appropriate volume associated with the volume received. The additional volume with assigned RINs may be addressed with a second PTD. Question and Answer was originally posted at: Questions and Answers…
- Last published:
-
Why have the fees for Lead-Based Paint Activities program decreased since they were first implemented in 1999?
Since 1999, EPA has made substantial changes in the way it administers its accreditation and certification program. The transition to the automated federal Lead-based Paint Program (FLPP) database and the associated centralized data processing has resulted in lower overall costs of the Lead-Based Paint Activities program . Question Number: 23002-33300…
- Last published:
-
How do I notify EPA if I have changed some of the components of my fuel and/or fuel additive?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Information related to updating fuel and fuel additive registrations is available here: Register or Update a Fuel or Fuel Additive Request under 40 CFR Part 79 .
- Last published:
-
Am I required to register biodiesel? How would I do that?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Manufacturers/importers of biodiesel for on-road use are required to register the fuel with the EPA. To register, see Register or Update a Fuel or Fuel Additive Request under 40 CFR Part 79 . Additionally, please attach the following…
- Last published: