Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable fuel definitions Total results: 1
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 49 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment ( 71 FR 77266 ). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC requirements to provide general…
- Last published:
-
While there is no renewable fuel obligation under the RFS2 program for the production or importation of conventional jet fuel, RINs can be generated for renewable jet fuel. Is that right?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . As described in 80.1407, only gasoline and diesel fuels produced or imported into the U.S. are subject to the renewable fuel standards. Thus, only gasoline and diesel fuel volumes produced or imported by an obligated party factor into…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Could an organization in the coalition be a Project Subrecipient if there is a conflict-of-interest policy in place?
Full Question If we develop a conflict-of-interest policy and require recusal from evaluating or prioritizing projects where a conflict arises, would this allow EJ orgs to submit projects for funding even if they are getting paid to advise on the structure and process for the re-grant program and participation in…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published:
-
Is there an expectation on whether small subawards, for ~ $50K, or large subawards, for ~$750K are preferable? For example, a large subaward could be the only thing a regional PR could award if they ask for the minimum of $2,000,000.
The RFA does not state a preference for the size of the subaward, so long as the subaward is within the $50,000 to $750,000 limit. GLNPO will look to applicants to describe the program to be carried out and why this amount of subaward funding makes sense for their specific…
- Last published:
-
Can letters of support be emailed directly to EPA?
Only materials submitted as part of the grant application submitted on Grants.gov will be considered. If supporters wish to send letters directly to EPA, they may email ( [email protected] ). However, for them to be considered with the application, the applicant organization should be copied on those email messages with…
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above…
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with the alternative measures in section 112.7(d).
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from oil transfers into or from the mobile refueler. The general…
- Last published:
-
Is it better to not include letters of support from orgs given that they will ultimately be subject to have to apply in a competitive process?
Full Question: The RFA mentions that contractors and subawards must be awarded competitively, however in our niche field and in many of these underserved communities (especially in less urban environments) there may only be 1 or 2 sub-awardees/contractors to work with at all. Should we apply with support listed from…
- Last published:
-
We understand that our nonprofit could not be both the regranter and the regrantee, but does the prohibition against receiving EJ grants extend to board members of our organization?
If the board members help make decisions for the main grantee, there would be a potential conflict of interest if they were to also receive grants as subrecipients.