Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Reporting Total results: 22
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Pre-Renovation Education Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 50 results
-
What will constitute a valid electronic signature for electronic submission of reports to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA will require that each party who wants to report electronically must sign an agreement that the use of electronic reporting methods will be considered equivalent to paper methods and that personal identification numbers assigned by EPA will…
- Last published:
-
What is the definition of a responsible corporate officer (RCO) who is required to certify some of the submissions involved?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.75(n), reports to EPA must be signed and certified as correct by the owner or a responsible corporate officer of the refiner, importer, or oxygenate blender. "Owner" means the person who is the principal owner of…
- Last published:
-
Could we become the delegated authority for submission of reports on behalf of our members?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Individual blenders could rely on your association to submit reports to EPA on their behalf. . However you should understand that if any reports are not submitted or are submitted improperly then responsibility would fall upon the individual…
- Last published:
-
By our reading of the regulations, the only reporting required of the oxygenate blender who elects to comply with the oxygen standard on a per gallon basis is a yearly report due the last day of February of each year (beginning in 1996) that states the to
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Your interpretation is correct.(10/31/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997 (PDF) (333 pp, 18.17 MB, EPA420-R-03-009, July 2003, About…
- Last published:
-
Question 14, Section VI.C., of the July 1, 1994 Question and Answer Document provides an example of the creation and addition of two different batches to form a composite mixture. All or a portion of this composite is shipped as RFG. How will the refinery
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Question 14 relates to in-line blending operations that have petitioned EPA for and received an exemption from the independent sampling and testing requirements of the RFG regulations. In such petitions, refiners often define a "batch" of in-line blended…
- Last published:
-
The batch report requires reporting the volume percent for six oxygenates -methanol, MTBE, ethanol, ETBE, TAME and t-butanol. If a refiner or oxygenate blender uses MTBE or ethanol as an oxygenate, and does not include in its calculation of oxygen weight
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Trace amounts of oxygenates that may be present in MTBE or ethanol do not have to be reported. However, where a refiner reports total oxygen weight percent that includes MTBE or ethanol plus other oxygenates in larger than…
- Last published:
-
May I use the pamphlet “Protect Your Family From Lead in Your Home” to meet my obligations for pre-renovation education under the RRP Rule?
Answer: No. As of December 22, 2008, only the pamphlet “ Renovate Right ” may be used to comply with the pre-renovation education requirements of the RRP Rule. “ Protect Your Family ” is still available for use during real-estate sales and lease transactions and for general information. Question Number…
- Last published:
-
My firm is replacing windows in a condominium. Is this type of exterior work considered work in a common area, and if so, must other owners and occupants be informed about the job?
Exterior renovations of multi-unit target housing are considered renovations of a common area. A common area is a portion of a building that is generally accessible to all residents or users of the building. Renovations in common areas of multi-unit target housing, such as condominiums, must be performed in accordance…
- Last published:
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
- Last published:
-
When multiple contractors are involved in a single renovation, must every contractor provide pre-renovation education? Can a certified firm assign its responsibility to a property management company?
All firms performing, offering or claiming to perform renovations are responsible for ensuring compliance with the pre-renovation education requirements of the RRP Rule. However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation. Accordingly, a firm may discharge the task by…
- Last published:
-
How should a party producing reformulated gasoline or RBOB make the designation of per gallon or average for the appropriate fuel parameters?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If filing by paper, the party should submit the Annual Compliance Designation with its first quarter batch reports. If filing electronically, the first batch report transmitted must include the designations which will apply to each subsequent batch for…
- Last published:
-
Regulation Section 80.1131(b)(4) states that, in the event that the same RIN is transferred to two or more parties, ?all such RINs will be deemed to be invalid, unless EPA in its sole discretion determines that some portion of these RINS is valid?. What?s
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In many circumstances, EPA will be able to determine whether any of the RINs (or particular gallon-RINs within a batch-RIN) are valid from the information submitted to EPA in the RIN generation and transaction reports. Through these reports…
- Last published:
-
I am planning on sending the pamphlet via certificate of mailing to a tenant who occupies a unit scheduled to be renovated. Does the tenant’s name need to be addressed on the mailing, or is it acceptable to address the envelope to Attn: Tenant/Occupant?
Answer: The tenant’s name and address must be indicated on the mailing. The RRP Rule requires a renovator to provide the “Renovate Right” pamphlet to an adult in each unit. Therefore, the name and address of an adult occupant in each unit must be indicated on the mailing. The renovator…
- Last published:
-
If working in target housing occupied by persons who are blind, how should a firm comply with the pre-renovation information distribution requirements?
EPA’s pamphlet titled Renovate Right: Important Lead Hazard Information for Families, Child Care Providers and Schools is currently not published in a Braille format. In addition to distributing the regular pamphlet, a firm working in such an environment should take extra precaution to ensure that the owner and occupants are…
- Last published:
-
If a firm completely blocks access to a common area for the duration of a renovation, does the renovator still have to provide notifications to all tenants?
When tenant accessibility to a work site within a common area can be precluded for the duration of a renovation, EPA considers that work site to be temporarily excluded from the common area of the building for pre-renovation education purposes because it is not accessible to the residents and users…
- Last published: