Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Reporting Total results: 22
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Recordkeeping and Reporting Requirements Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 42 results
-
What will constitute a valid electronic signature for electronic submission of reports to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA will require that each party who wants to report electronically must sign an agreement that the use of electronic reporting methods will be considered equivalent to paper methods and that personal identification numbers assigned by EPA will…
- Last published:
-
What is the definition of a responsible corporate officer (RCO) who is required to certify some of the submissions involved?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.75(n), reports to EPA must be signed and certified as correct by the owner or a responsible corporate officer of the refiner, importer, or oxygenate blender. "Owner" means the person who is the principal owner of…
- Last published:
-
Could we become the delegated authority for submission of reports on behalf of our members?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Individual blenders could rely on your association to submit reports to EPA on their behalf. . However you should understand that if any reports are not submitted or are submitted improperly then responsibility would fall upon the individual…
- Last published:
-
By our reading of the regulations, the only reporting required of the oxygenate blender who elects to comply with the oxygen standard on a per gallon basis is a yearly report due the last day of February of each year (beginning in 1996) that states the to
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Your interpretation is correct.(10/31/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997 (PDF) (333 pp, 18.17 MB, EPA420-R-03-009, July 2003, About…
- Last published:
-
Question 14, Section VI.C., of the July 1, 1994 Question and Answer Document provides an example of the creation and addition of two different batches to form a composite mixture. All or a portion of this composite is shipped as RFG. How will the refinery
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Question 14 relates to in-line blending operations that have petitioned EPA for and received an exemption from the independent sampling and testing requirements of the RFG regulations. In such petitions, refiners often define a "batch" of in-line blended…
- Last published:
-
The batch report requires reporting the volume percent for six oxygenates -methanol, MTBE, ethanol, ETBE, TAME and t-butanol. If a refiner or oxygenate blender uses MTBE or ethanol as an oxygenate, and does not include in its calculation of oxygen weight
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Trace amounts of oxygenates that may be present in MTBE or ethanol do not have to be reported. However, where a refiner reports total oxygen weight percent that includes MTBE or ethanol plus other oxygenates in larger than…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
How should a party producing reformulated gasoline or RBOB make the designation of per gallon or average for the appropriate fuel parameters?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If filing by paper, the party should submit the Annual Compliance Designation with its first quarter batch reports. If filing electronically, the first batch report transmitted must include the designations which will apply to each subsequent batch for…
- Last published:
-
Regulation Section 80.1131(b)(4) states that, in the event that the same RIN is transferred to two or more parties, ?all such RINs will be deemed to be invalid, unless EPA in its sole discretion determines that some portion of these RINS is valid?. What?s
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In many circumstances, EPA will be able to determine whether any of the RINs (or particular gallon-RINs within a batch-RIN) are valid from the information submitted to EPA in the RIN generation and transaction reports. Through these reports…
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
My firm installs carpets. Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is. How do I know when I need to comply with the Lead Renovation, Repair and Painting (RRP) Rule?
If when installing the carpet, you disrupt six square feet or less of painted surface per room, the job is not covered by the RRP Rule . Question Number: 23002-19749 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published: