Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Reporting Total results: 22
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 30 of 106 results
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
How should a party producing reformulated gasoline or RBOB make the designation of per gallon or average for the appropriate fuel parameters?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If filing by paper, the party should submit the Annual Compliance Designation with its first quarter batch reports. If filing electronically, the first batch report transmitted must include the designations which will apply to each subsequent batch for…
- Last published:
-
Regulation Section 80.1131(b)(4) states that, in the event that the same RIN is transferred to two or more parties, ?all such RINs will be deemed to be invalid, unless EPA in its sole discretion determines that some portion of these RINS is valid?. What?s
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In many circumstances, EPA will be able to determine whether any of the RINs (or particular gallon-RINs within a batch-RIN) are valid from the information submitted to EPA in the RIN generation and transaction reports. Through these reports…
- Last published:
-
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated event. How long does such a building remain a child-occupied facility?
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated or rare event. How long does such a building remain a child-occupied facility? Answer: A building, or portion of a building, is…
- Last published:
-
Are renovations that disturb stucco subject to the RRP Rule? Does it matter whether the stucco has been painted?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. Therefore, renovations that disturb stucco are subject to the RRP Rule only if the stucco has been painted. Question Number: 23002-14025 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP rule apply to contractors working on homes damaged by a hurricane or other natural disaster?
Damage from a major storm or other natural disaster could result in the need for emergency renovations. Certain requirements of the RRP Rule do not apply to emergency renovations, which are renovation activities that were not planned but result from a sudden, unexpected event that, if not immediately attended to…
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Are Department of Energy weatherization projects covered under the RRP Rule?
Answer : The Lead Renovation, Repair, and Painting (RRP) Rule defines “renovation” to include weatherization projects such as cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, and planing thresholds to install weather stripping. Other types of weatherization projects, such as window replacement, are…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published: