Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Foreign producers and importers Total results: 2
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Recordkeeping and Reporting Requirements Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 12 of 12 results
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
What sources make up the Tier 1 categories used in the emissions trends?
Tier 1 categories are assigned by source classification codes (SCCs) that are the most specific processes available in the NEI. The latest SCC list with the Tier 1 assignments can be downloaded from the EPA SCC website in Comma Separate Values (CSV) format.
- Last published:
-
What is the cause of the large decrease in electric utility emissions, particularly sulfur dioxide, starting in 1995?
SO2 emissions reductions from utilities during this time are primarily attributed to the impacts of the acid rain program. As described on EPA’s Acid Rain Program web page, Phase 1 of this program began in 1995 and affected 263 units at 110 most coal-burning electric utility plants in 21 eastern…
- Last published:
-
Does an ethanol producer who sells undenatured ethanol to a U.S. importer who denatures it at the port need to register with EPA under RFS?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The RFS regulations specify that foreign producers of ethanol for use in transportation fuel, heating oil or jet fuel for import to the US who do not add denaturant to their product, must register under RFS. See 80.1450(b)…
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
Under the RRP Rule, can the certified renovator comply with the rules by keeping records regarding his certification and employee training electronically, provided he can display them on a hand held device or laptop on the job site?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule does not specify the format in which these documents must be kept, but they must be available at the work site. Documents are not available if they cannot be viewed. Certified renovators must have with them at the work site copies…
- Last published:
-
What are the requirements for a foreign producer who wishes to generate RINs for the renewable fuel they produce?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Foreign producers who plan to generate RINs must register and conduct a third-party engineering review pursuant to section 80.1450. Additionally, such foreign producers must meet the requirements in section 80.1466 prior to generating any RINs for their fuel…
- Last published:
-
If a general contractor and one or more subcontractors are involved in a single renovation project, which persons or entities are responsible for preparing, retaining and making available the necessary records?
Answer: The certified renovator, whether assigned by a general contractor or subcontractor, is responsible for preparing the records demonstrating that the renovation was conducted in compliance with the work practice standards, including training provided to non-certified workers. All renovation firms involved in a project share the responsibility for retaining and…
- Last published:
-
Why do mobile source NOx emissions jump higher between 2001 and 2002 on the emissions trends?
The emissions model used for mobile sources changed from MOBILE6.2 to MOVES 2010 in December 2009. This change included a notable increase in NOx emissions. The EPA adjusted data back to 2002 to reflect the change in models. The higher emissions in 2002 are because of this method change and…
- Last published:
-
Why do the PM2.5 emissions for the electric utilities source category jump up between 1998 and 1999?
The estimation method for PM emissions from fuel combustion sources was enhanced beginning with the 1999 National Emissions Inventory. Prior to 1999, the emissions measurement data methodology only included the filterable portion (which means the solid particle matter at elevated stack temperatures). Beginning with the 1999 NEI, both the filterable…
- Last published:
-
What records must a subcontractor keep?
Answer: If the certified renovator assigned to the project is assigned by the subcontractor, the certified renovator is responsible for preparing the records demonstrating that the renovation was conducted in compliance with the work practice standards, including training provided to non-certified workers. All renovation firms involved in a project share…
- Last published:
-
I hear new record keeping requirements will take effect soon. What are they and when must my firm begin to comply with them?
Answer: Beginning July 6, 2010, when the final invoice for the renovation is delivered, or within 30 days of the completion of the renovation, whichever is earlier, the renovation firm must provide information demonstrating compliance with the training and work practice requirements of the RRP Rule to the owner of…
- Last published: