Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Generation of RINs Total results: 6
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 24 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment ( 71 FR 77266 ). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC requirements to provide general…
- Last published:
-
Can a gallon of ethanol generate more than 1.0 RIN in RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel are determined by the Equivalence Values. See 80.1415 and 80.1426(f)(2)-(6). Equivalence Values are based on energy content in the renewable fuel in comparison to…
- Last published:
-
If I produce biodiesel using waste vegetable oil, can I generate more RINs per gallon than if I use virgin soy oil? Would the use of solar panels as a heat source for our process help with our RIN number per gallon?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel is determined by the Equivalence Values. See regulations at 80.1415(b) and 8.1426(f)(2)(i), for example. Equivalence Values are based on energy content in the renewable…
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above…
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with the alternative measures in section 112.7(d).
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from oil transfers into or from the mobile refueler. The general…
- Last published:
-
What is the operational tolerance for denaturant in ethanol to meet the definition of Renewable Fuel? The RFS2 definition calls for a maximum of 2% denaturant. What if the lab results come back higher or lower than 2%? For example, what if the lab results
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The definition of renewable fuel in 80.1401 specifies that the maximum amount of denaturant in ethanol that can be treated as renewable fuel is 2 volume percent. If lab results indicate that the concentration of denaturant is higher…
- Last published:
-
Eligibility for qualified oil-filled operational equipment in event of a discharge
Does a facility automatically lose eligibility for the option for qualified oil-filled operational equipment if the equipment has an oil discharge? No. Facilities that choose this alternative and later have a reportable oil discharge from qualified oil-filled operational equipment do not automatically lose eligibility. However, the spill reporting requirements would…
- Last published:
-
Can qualified facilities also use the alternative requirements for qualified oil-filled operational equipment?
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self-certify the SPCC Plan and is not required to have a PE develop…
- Last published:
-
If a producer is able to change its D code, can it make retroactive changes in the D code of the RINs it has issued previously during the year or earlier if the production during the previous period would meet the newly classified D code criteria?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Once a RIN is generated and transferred to another party, it cannot be changed. Thus, retroactive changes to D codes in RINs are not allowed.
- Last published:
-
Secondary containment calculations in SPCC Plan
The SPCC regulations in 40 CFR §112.7(c) require facilities to provide appropriate containment or diversionary structures or equipment to prevent discharges as described in §112.1(b). Does a facility's SPCC Plan have to include calculations to demonstrate compliance with the §112.7(c) general secondary containment requirements? EPA does not require facilities to…
- Last published:
-
What are the specifications for bulk storage secondary containment systems?
For purposes of the SPCC requirements, "secondary containment for bulk storage facilities must be constructed to at least provide for the capacity of the largest single tank with sufficient freeboard for precipitation. EPA believes that the proper standard of "sufficient freeboard" to contain precipitation is that amount necessary to contain…
- Last published:
-
What are the amended requirements for oil-filled operational equipment?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Inspection or monitoring program requirements when using alternative secondary containment for oil-filled operational equipment
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published: