Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Generation of RINs Total results: 6
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- In General Total results: 9
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 19 results
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
Can a gallon of ethanol generate more than 1.0 RIN in RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel are determined by the Equivalence Values. See 80.1415 and 80.1426(f)(2)-(6). Equivalence Values are based on energy content in the renewable fuel in comparison to…
- Last published:
-
If I produce biodiesel using waste vegetable oil, can I generate more RINs per gallon than if I use virgin soy oil? Would the use of solar panels as a heat source for our process help with our RIN number per gallon?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel is determined by the Equivalence Values. See regulations at 80.1415(b) and 8.1426(f)(2)(i), for example. Equivalence Values are based on energy content in the renewable…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
What is the operational tolerance for denaturant in ethanol to meet the definition of Renewable Fuel? The RFS2 definition calls for a maximum of 2% denaturant. What if the lab results come back higher or lower than 2%? For example, what if the lab results
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The definition of renewable fuel in 80.1401 specifies that the maximum amount of denaturant in ethanol that can be treated as renewable fuel is 2 volume percent. If lab results indicate that the concentration of denaturant is higher…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published:
-
My firm repairs windows by removing and replacing the sash. We may disturb paint on the hinges and screws, but do not otherwise disturb a painted surface. Is this work subject to the Lead Renovation, Repair and Painting (RRP) Rule?
Replacement of a window sash by simply unscrewing hinges or releasing it from a jambliner does not constitute "window replacement" for purposes of the RRP Rule . Therefore, such tasks may fit within the definition of minor repair and maintenance i.e., activities that disturb six square feet or less of…
- Last published:
-
What is the key question EPA tries to answer through a site investigation?
Findings of the site investigation determine what hazardous substances may be present, whether they may be released to the environment, and any potential threat to human health. Information about the site that is collected in the preliminary assessment and site investigation phase helps EPA to evaluate the risks posed by…
- Last published:
-
If a producer is able to change its D code, can it make retroactive changes in the D code of the RINs it has issued previously during the year or earlier if the production during the previous period would meet the newly classified D code criteria?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Once a RIN is generated and transferred to another party, it cannot be changed. Thus, retroactive changes to D codes in RINs are not allowed.
- Last published: