Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Reporting Total results: 37
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 57 results
-
I have not seen a reference to the EPA CDX system. Is the CDX system already established or can we submit reports in our choice of electronic formats?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The Central Data Exchange (CDX) is an established portal through which electronic data are submitted. All registered parties will have to first register with CDX in order to receive a CDX registration number. More information may be found…
- Last published:
-
Do I have to register to use CDX and is this a separate registration process?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . You will have to register with CDX. (Registering with CDX is not the same as registering under regulation Section 80.1150.) Instructions are available via our Reporting for Fuel Programs web site. Question and Answer was originally posted at…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
If re-transmission is necessary due to fault on EPA?s part, why won?t EPA pay for re-transmission?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA will take all reasonable steps to properly maintain equipment, services, and testing necessary to effectively and reliably send and receive documents via EDI. Although EPA is unable to pay for re-transmission costs, we will exercise the highest…
- Last published:
-
Could we become the delegated authority for submission of reports on behalf of our members?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Individual blenders could rely on your association to submit reports to EPA on their behalf. . However you should understand that if any reports are not submitted or are submitted improperly then responsibility would fall upon the individual…
- Last published:
-
Section 80.1164(a)(1)(ii) of the regulation states that the CPA conducting the attest engagement must obtain documentation of any volumes of renewable fuel used in gasoline during the reporting year; compute and report as a finding the volumes of renewabl
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . This provision is intended to require the CPA to include in his or her report any volume of renewable fuel actually used in gasoline produced at the refinery or imported by the importer, but is not intended to…
- Last published:
-
When you make the annual designation as an importer does it apply to all of your imported gasoline, or can you designate average or per gallon compliance parameters for each import facility?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Importers must use the same per gallon or average designations for all reformulated gasoline imported each year, regardless of where that reformulated gasoline is imported.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline…
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
With regard to the record keeping requirement for test results, please clarify the document which must be kept.
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.74(a)(2)(iii) requires any regulated party who samples and tests reformulated gasoline or RBOB to maintain records containing the results of the tests. The headnotes of § 80.74 specifies that the record keeping period is five years from…