Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Purpose Total results: 6
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Treatment of biomass-based diesel Total results: 3
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 17 results
-
What is defined as a structure (home or place of business)?
While generally defined as a building, a structure under the structural cleaning program will include only those habitable spaces where indoor occupancy is frequent and regularly occurring on a daily or near-daily basis. Examples of residential structures include primary residences and living spaces, and examples of commercial structures include offices…
- Last published:
-
Why is cleaning of homes and places of businesses happening?
Norfolk Southern, with EPA oversight, is providing indoor cleaning to eligible occupants in response to concerns about the impact of the derailment and cleanup work on homes and places of businesses. The cleaning is to address potential dust that may have been generated as part of the train derailment and…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
What work still needs to be done at the derailment site?
Although contaminated soil has been excavated and removed from the derailment site, some additional work remains. Soil sampling continues to check all areas where cleanup operations took place. Stream assessments continue, and culvert clean out has started. Groundwater and drinking water sampling also continues. Expect these investigations and possible additional…
- Last published:
-
Does this mean my home or place of business is contaminated?
No. However, indoor cleaning is being offered to address potential dust emissions that may have been generated as part of the train derailment and cleanup work. This service is being offered as an additional service to interested members of the community.
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
Is there any volume cap when using previously-retired 2008 or 2009 biodiesel RINs to satisfy an obligated party?s 2010 Biomass Based Diesel RVO? Can 2008 or 2009 biodiesel RINs that were previously-retired in 2009 also be used to satisfy Advanced Biofuel
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . 2008 and 2009 biodiesel and renewable diesel RINs (that is, RFS1 RINs with a D code of 2 and RR code of 15 or 17) used for compliance purposes in 2009 can also be used to reduce the…
- Last published:
-
The regulations at 80.1427(a)(7)(iii) say that 2008 biodiesel RINS + 2009 biodiesel RINs cannot exceed 20% of the 2010 RVO. Does this mean that 80% of the 2010 biomass-based diesel RVO has to come from 2010 RINs?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The 20% rollover cap under RFS2 is the same as the rollover cap under the RFS1 program. However, the rollover cap only places a limit on previous year RINs that were NOT used for compliance in 2008 or…
- Last published:
-
If a facility is grandfathered, is it also exempt from the requirement that feedstocks must be renewable biomass?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Even if a facility is exempt from the 20% GHG reduction requirement, in order to generate RINs, the facility is still required to use feedstocks that meet the definition of renewable biomass. The definition of renewable fuel in…
- Last published:
-
Are Canadian facilities included in the grandfathering provision? Does the grandfathering provision extend to facilities that commenced production up to December 31, 2009?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The grandfathering provisions apply equally to facilities inside and outside the RFS program area. Facilities that commenced construction (as defined in §80.1403(a)(4)) prior to December 19, 2007, and which satisfy the timely construction requirements of §80.1403(c)(1) and (2)…
- Last published:
-
Under section 80.1405, the standard for biomass based diesel (BBD) is calculated via a fraction, the numerator of which is equal to the RFV for BBD in compliance year i times 1.5. For 2010 only, would you agree that, using the example of the calculation f
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The percentage standard for biomass-based diesel in years 2011 and beyond will be based upon the volumes specified in CAA 211(o)(2)(B)(i)(IV), unless some portion of that volume is waived per CAA 211(o)(7)(E). For 2010, the numerator of the…
- Last published:
-
Table 1 in 80.1426 does not include a coal fired ethanol plant. If a coal fired plant can be demonstrated as "grandfathered-in," can we assume the ethanol produced will have a D code of 6?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Per 80.1403(c), all facilities (including coal-fired facilities) for which construction commenced prior to December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction may qualify for grandfathered status regardless of the…
- Last published: