Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Learn About Asbestos Total results: 2
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Firm Certification Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 36 results
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
Since asbestos was banned, do I need to be worried about products on the market today containing asbestos?
On March 28, 2024, EPA issued a final rule prohibiting all ongoing uses of chrysotile asbestos, the only form of asbestos still manufactured (including imported), processed and distributed in the U.S. The final rule prohibitions are by specific use and phased-in over a period of months to several years, depending…
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
If a company has several legal entities, does each entity have to become a certified firm?
Answer: Yes, if the corporate structure is such that the parent company is not liable for actions of the separate legal entities. Question Number: 23002-18225 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My non-profit organization applies for and receives grants to renovate older homes. We do not perform the renovations ourselves, we hire renovation contractors to perform them on our behalf. Must my non-profit organization become an RRP-certified firm?
Answer: Yes, even though your organization's employees do not actually perform the renovation activities, your organization must be an RRP-certified renovation firm because your organization, through the grant process, is offering to perform renovations for compensation, i.e., the grant. Question Number: 23002-19775 Find a printable PDF copy of all frequent…
- Last published:
-
I am a facilities manager for a church with daycare and preschool programs. I recently became a certified renovator. If my staff and I do our own painting and remodeling work, do we need to be a certified firm?
Answer: Yes, if you perform, offer, or claim to perform renovations in a portion of the building that is a child-occupied facility. The RRP Rule defines a child-occupied facility as a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under 6 years…
- Last published:
-
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbance of paint will not occur?
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbances of painted surfaces will not occur? For example, a certified firm establishes containment and removes wall and…
- Last published:
-
Must maintenance workers at kindergartens and elementary schools become certified renovators if they perform renovations covered by the RRP Rule? Are the schools or school systems then required to become certified renovation firms?
On or after April 22, 2010, all renovations covered by the Lead Renovation, Repair and Painting (RRP) Rule must be directed by certified renovators and must be performed by certified renovators or individuals trained by a certified renovator. The RRP rule requires any firm, including a local government agency that…
- Last published:
-
If a facility is grandfathered, is it also exempt from the requirement that feedstocks must be renewable biomass?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Even if a facility is exempt from the 20% GHG reduction requirement, in order to generate RINs, the facility is still required to use feedstocks that meet the definition of renewable biomass. The definition of renewable fuel in…
- Last published:
-
Are Canadian facilities included in the grandfathering provision? Does the grandfathering provision extend to facilities that commenced production up to December 31, 2009?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The grandfathering provisions apply equally to facilities inside and outside the RFS program area. Facilities that commenced construction (as defined in §80.1403(a)(4)) prior to December 19, 2007, and which satisfy the timely construction requirements of §80.1403(c)(1) and (2)…
- Last published:
-
Can contractors submit their application to EPA before they complete required training, or must the application be submitted after the training is complete? Is proof of training required by the EPA in order for the contractor's application to be approved?
Answer: The firm certification process does not include the submission of renovator training credentials, so a firm can apply for certification before completing required training. As part of the application, the firm is required to certify it will comply with the requirements of the RRP Rule, including ensuring that all…
- Last published:
-
My firm acts as a general contractor - we subcontract the entire renovation job to other companies rather than using our own employees. Under the Renovation, Repair, and Painting (RRP) Rule, does my firm need to have a certified renovator at the job site?
Answer: Not necessarily. All firms performing renovations, including general contractors, must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator. A firm acting as a general contractor may satisfy this requirement by hiring another certified…
- Last published: