Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- In General Total results: 9
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 29 results
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
Can I get gas at Leake Oil on Taggart Street?
No, Leake Oil is currently closed due to site activities. They have an alternate location on N. Market Street.
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published: