Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Reinstating RINs Total results: 4
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 14 of 14 results
-
May I generate RINs that I produced and sold for non-road use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.1426(c)(2) provides that RINs are assigned to a volume of renewable fuel when ownership of the RIN is transferred along with ownership of the volume of renewable fuel. A comparable provision appear in the RFS1 regulations, at…
- Last published:
-
What if there is a gap in coverage of the GLEJGP?
EPA has set up national technical assistance centers (TCTACs), including one solely for tribes and tribal nations, that are geared towards communities. There are two in Region 5: one in Minneapolis and one in Chicago. The TCTACs are separate from this RFA ; however, they cover the entire Great Lakes…
- Last published:
-
May I generate RINs for renewable fuel that I produced and sold for non-motor vehicle use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. RINs that were previously generated in 2009 and 2010 may be reinstated if they were retired for non-motor vehicle use. However, RINs may not be generated for renewable fuel produced in the past in order to retire…
- Last published:
-
Does EPA have a minimum threshold/definition for the Regional scale program? In other words, what does Regional mean or is it open to applicants to determine at any scale?
GLNPO wants to be extremely flexible and encourage PRs to think about which regions they could expect to effectively cover when creating their application. There are no additional criteria from EPA on how big or small the Project RFA should be.
- Last published:
-
In addition to 2009 RINs, may a party reinstate 2008 and 2010 RINs that were retired for non-road use under RFS1?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), any 2009 RINs that were retired for non-motor vehicle, heating oil or jet fuel use under RFS1 may be reinstated under RFS2. The regulations do not allow 2008 RINs to be reinstated. Since RFS1 RINs…
- Last published:
-
How does a retiring party reinstate RFS1 RINs that were retired because renewable fuel was ultimately used for non-motor vehicle, heating oil or jet fuel purposes? What steps are required to be taken and do any codes require changing?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), parties may reinstate 2009 RINs that were retired under RFS1 because the renewable fuel was ultimately used in a non-motor vehicle application, heating oil or jet fuel. As stated in question 11.1, since RFS1 RINs…
- Last published:
-
Why are gloves, which are exposed to large amounts of lead dust, not required to be disposed of under the Lead Renovation, Repair and Painting (RRP) Rule?
The RRP Rule requires the renovation firm to use precautions to ensure that all personnel, tools, and other items are free of dust and debris before leaving the work area. Workers with contaminated clothing can take that contamination home to their own children, and taking contaminated equipment to another jobsite…
- Last published:
-
Could a regional application, include an entire state?
Yes, with the caveat that the entire state must fall within the historic bounds of the Great Lakes basin. For example, if the Principal Recipient is proposing a GLEJGP for the state of Illinois, projects may fall in the portion of the state within the Great Lakes basin, but not…
- Last published:
-
How should lead-containing wastes from RRP renovations be handled and disposed?
While at the work site, wastes must be collected at the conclusion of each work day and at the conclusion of the renovation and stored under containment, in an enclosure, or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published:
-
Can non-certified workers transport debris off site under the RRP Rule if they have had documented on-the-job training in this activity by the certified renovator?
Answer: Yes. The RRP Rule requires the certified renovator to regularly direct the work being performed by other individuals to ensure that the work practices are being followed, including ensuring that dust or debris does not spread beyond the work site. The certified renovator is responsible for providing training to…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, how should I dispose of contaminated water used in two-bucket mopping?
EPA recommends contacting your local water treatment authority and asking about local requirements for handling and disposing of waste water. Question Number: 23002-20756 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does funding through this grant include municipalities within the Chicago River watershed?
Yes, including the historic Chicago River watershed.
- Last published:
-
Will basin wide PR serve areas without a designated PR for smaller part of the region, or will their service areas overlap?
If the Project RFA will be serving the entire basin, I.e., a basin-wide GLEJGP, this could be delegated within a coalition (if it is a coalition that has applied). Otherwise, the PR organization will be serving the entire basin. If there is a basin-wide PR as well as a smaller…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, what type of container is adequate for on-site storage of debris?
At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published: