Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Reinstating RINs Total results: 4
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Physical work updates, road closures, and upcoming public meetings
- Taggart Street Reopening
- Reinstating RINs
Displaying 1 - 15 of 19 results
-
May I generate RINs that I produced and sold for non-road use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.1426(c)(2) provides that RINs are assigned to a volume of renewable fuel when ownership of the RIN is transferred along with ownership of the volume of renewable fuel. A comparable provision appear in the RFS1 regulations, at…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
What is the research workshop that National Institutes of Health (NIH) and the national academies are planning in East Palestine and the greater community?
NIH is putting plans in place to work with the National Academies of Sciences, Engineering, and Medicine to hold a workshop. The purpose of the workshop is to explore potential research priorities to understand the short- and longterm health impacts of the Norfolk Southern Train Derailment. The workshop will be…
- Last published:
-
May I generate RINs for renewable fuel that I produced and sold for non-motor vehicle use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. RINs that were previously generated in 2009 and 2010 may be reinstated if they were retired for non-motor vehicle use. However, RINs may not be generated for renewable fuel produced in the past in order to retire…
- Last published:
-
Can I get gas at Leake Oil on Taggart Street?
No, Leake Oil is currently closed due to site activities. They have an alternate location on N. Market Street.
- Last published:
-
In addition to 2009 RINs, may a party reinstate 2008 and 2010 RINs that were retired for non-road use under RFS1?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), any 2009 RINs that were retired for non-motor vehicle, heating oil or jet fuel use under RFS1 may be reinstated under RFS2. The regulations do not allow 2008 RINs to be reinstated. Since RFS1 RINs…
- Last published:
-
How does a retiring party reinstate RFS1 RINs that were retired because renewable fuel was ultimately used for non-motor vehicle, heating oil or jet fuel purposes? What steps are required to be taken and do any codes require changing?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), parties may reinstate 2009 RINs that were retired under RFS1 because the renewable fuel was ultimately used in a non-motor vehicle application, heating oil or jet fuel. As stated in question 11.1, since RFS1 RINs…
- Last published:
-
Will air monitoring continue around Taggart Street?
Stationary and mobile air monitoring continues around the community and within the derailment site. As the excavation work is completed and remaining waste removed, air monitoring will be reduced.
- Last published:
-
Can I walk along Taggart Street?
Pedestrians are discouraged from walking on Taggart Street for safety reasons. Heavy equipment and truck traffic are still present, and there are no sidewalks along some stretches of the street.
- Last published:
-
Why are street cleaners no longer watering Taggart the same way they used to?
Street cleaners now lightly mist Taggart with water before using a vacuum truck to collect material from the road. Crews adopted this approach to keep sediment and dust out of the storm drains and Sulphur Run.
- Last published:
-
How many trucks are still expected throughout the day? What is in the trucks?
Up to 50-100 water, soil, and support vehicles per day are still anticipated as remaining contaminated soil and treated wastewater are shipped off-site. Also, as excavation concludes, trucks will enter the derailment site with clean soil (backfill).
- Last published:
-
Are street sweeping and road wetting still taking place?
Yes, street sweeping and road wetting on Taggart Street will continue on the roads surrounding the derailment site. Street sweepers and water trucks move slowly, so please exercise caution if you are behind either of these vehicles.
- Last published: