Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable volume obligations Total results: 3
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Renewable volume obligations
- Communications and Public Engagement
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 9 of 9 results
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
How can residents communicate with EPA about activities at the Norwood Landfill site?
This EPA website ( www.epa.gov/norwood ) is dedicated to the investigations in the Norwood community. We encourage you to use the site and submit any questions you might have through the form that appears on the website. We also welcome any feedback you might have on the webpage.
- Last published:
-
Where can residents get the most accurate and up-to-date information on the Norwood Landfill site?
The www.epa.gov/norwood website is the site with the most accurate and up-to-date information regarding EPA’s investigations in the Norwood community.
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Is the volume of renewable fuels a fixed number of gallons? How does this affect an obligated party's requirements?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The volume of renewable fuel used as the basis for calculating the percentage renewable fuel standards is fixed by CCA 211(o)(2)(B) for certain years (through 2012 for biomass-based diesel and 2022 for other renewable fuels), with volumes after…
- Last published:
-
If I want to talk with EPA about sampling on my property or ask a specific question about my property, who should I contact?
Please contact Katie Page, EPA Community Involvement Coordinator, at 215-814-2409 or [email protected] to ask any questions related to your property.
- Last published:
-
Can 2009 Cellulosic Biomass ethanol RINs (with a D code of 1) be used to satisfy an obligated party?s Cellulosic Biofuel and/or Advanced Biofuel RVO in 2010? Is there a 20% rollover cap on this type of RIN being used to satisfy the Cellulosic and/or Advan
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . 2009 cellulosic biomass ethanol RINs with a D code of 1 that are not used for compliance purposes in 2009 can be used to meet the cellulosic biofuel, advanced biofuel, and total renewable fuel RVOs in 2010. The…
- Last published:
-
I understand under CAA Section 211(o), compliance can be deferred for a year as long as the obligated party complies the next year. How does one petition for a one-year deferral? What criteria are considered?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . According to §80.1427(b), an obligated party may carry a deficit from one compliance year to the next under certain conditions. No petition for a deficit carryover is required. An obligated party will be presumed to be carrying over…
- Last published: