Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable volume obligations Total results: 3
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Work Practice Standards Total results: 41
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 31 - 44 of 44 results
-
If I mist and vacuum with a High Efficiency Particulate Air (HEPA) vacuum the plastic sheeting used by my firm for interior containment, can I move and re-use plastic sheeting on the same day and job?
No. The Lead Renovation, Repair and Painting Rule does not contemplate a permissible method of moving and re-using plastic sheeting used for interior containment. Question Number: 23002-18500 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, how should I dispose of contaminated water used in two-bucket mopping?
EPA recommends contacting your local water treatment authority and asking about local requirements for handling and disposing of waste water. Question Number: 23002-20756 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
I understand under CAA Section 211(o), compliance can be deferred for a year as long as the obligated party complies the next year. How does one petition for a one-year deferral? What criteria are considered?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . According to §80.1427(b), an obligated party may carry a deficit from one compliance year to the next under certain conditions. No petition for a deficit carryover is required. An obligated party will be presumed to be carrying over…
- Last published:
-
Are components removed from the home to be cleaned up and reused subject to the waste handling requirements in the rule?
Answer : While components to be reused rather than disposed of are not considered waste for the purposes of the Lead Renovation, Repair, and Painting (RRP) Rule , it is likely that, even if they do not contain lead-based paint, they are contaminated with dust or debris from the project…
- Last published:
-
Does the RRP rule require people working on a renovation to wear respirators, Tyvek(R) suits or other personal protective equipment (PPE)?
Answer: EPA would like to clarify the requirements for personal protective equipment. The Occupational Safety and Health Administration (OSHA) has requirements for personal protective equipment, EPA does not. For many years, EPA has recommended the use of personal protective equipment as a way to protect workers and to help ensure…
- Last published:
-
During exterior power washing, instead of plastic, can landscaping fabric or a similar material be used to capture any paint chips or other debris, but permit the water to seep through?
No. Landscaping fabric is not an impermeable m aterial. Question Number: 23002-15754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How can I use plastic sheeting in exterior renovations without creating a safety hazard? Moisture on the plastic from precipitation can cause plastic sheeting to become slippery.
Answer: For exterior renovations, cover the ground with plastic sheeting or other disposable impermeable material extending 10 feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to collect falling paint debris, whichever is greater, unless the property line prevents 10 feet of such ground covering. Ground containment…
- Last published:
-
Is interior containment required as well as exterior containment for an exterior window removal?
Yes. If removing windows from the exterior creates dust and debris on the interior as well as the exterior of the building, then the firm must follow the requirements in the Lead Renovation, Repair and Painting Rule for both interior and exterior containment. Before beginning the renovation, the firm must…
- Last published:
-
The Renovation, Repair, and Painting (RRP) Rule requires HEPA vacuums to be used for cleaning up the dust created by renovations. What should I look for when purchasing a HEPA vacuum?
According to the definition in 40 CFR 745.83 : " HEPA vacuum means a vacuum cleaner which has been designed with a high-efficiency particulate air (HEPA) filter as the last filtration stage. A HEPA filter is a filter that is capable of capturing particulates of 0.3 microns with 99.97% efficiency…
- Last published:
-
When I replace windows, I set up interior vertical containment barriers that extend from floor to ceiling and completely enclose the interior area in which I physically work. If these barriers are set up at a distance less than six feet from the perimeter of the work surface, must I still extend the containment on the floor beyond the vertical barrier to meet the six-foot requirement?
Answer: No, provided that the vertical containment system consists of impermeable barriers that extend from the floor to the ceiling and are tightly sealed at joints with the floor, ceiling and walls (40 CFR § 745.85(a)(2)(i)(D)). This type of vertical containment acts as the functional equivalent of a wall for…
- Last published:
-
The Lead Renovation, Repair and Painting (RRP) Rule provisions require exterior containment. At what point is the wind too strong to allow work to continue?
The work practices for exterior projects are based on a performance standard -- the certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, what type of container is adequate for on-site storage of debris?
At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published:
-
What is the “work area?”
Answer: The “work area” is the area established by a certified renovator to contain the dust and debris generated from a renovation. In other words, the work area is defined by the containment measures established by the certified renovator. While a renovator has some discretion in setting up a sufficient…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, is composite sampling acceptable for clearance in lieu of cleaning verification?
Yes. Under the RRP Rule , cleaning verification need not be performed if the contract between the renovation firm and the person contracting for the renovation or another Federal, State, Territorial, Tribal or local law or regulation requires: The renovation firm to perform dust clearance sampling at the conclusion of…
- Last published: