Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Treatment of biomass-based diesel Total results: 3
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 15 results
-
Is my EPA renovator certification accepted in all states and tribal areas?
Answer: Not necessarily. Whether to accept certification from another jurisdiction is up to the individual state or tribal area. EPA cannot compel states or tribes to adopt programs identical to the Federal program or to establish reciprocity provisions. However, EPA continues to encourage states and tribes that may be considering…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
Is there any volume cap when using previously-retired 2008 or 2009 biodiesel RINs to satisfy an obligated party?s 2010 Biomass Based Diesel RVO? Can 2008 or 2009 biodiesel RINs that were previously-retired in 2009 also be used to satisfy Advanced Biofuel
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . 2008 and 2009 biodiesel and renewable diesel RINs (that is, RFS1 RINs with a D code of 2 and RR code of 15 or 17) used for compliance purposes in 2009 can also be used to reduce the…
- Last published:
-
For purposes of cleaning the work area following a renovation, is the interior floor of a garage considered interior or exterior space?
In general, the interior floor of a garage is considered an interior space for purposes of post-renovation cleanup. EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are…
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is certified by an authorized state. Does this certification allow my firm to work in EPA-administered jurisdictions?
No. You must apply for and receive EPA certification before offering, performing, or claiming to perform renovations covered by the RRP Rule in EPA-administered jurisdictions. Question Number: 23002-19752 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
The regulations at 80.1427(a)(7)(iii) say that 2008 biodiesel RINS + 2009 biodiesel RINs cannot exceed 20% of the 2010 RVO. Does this mean that 80% of the 2010 biomass-based diesel RVO has to come from 2010 RINs?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The 20% rollover cap under RFS2 is the same as the rollover cap under the RFS1 program. However, the rollover cap only places a limit on previous year RINs that were NOT used for compliance in 2008 or…
- Last published:
-
My firm is replacing windows on a pre-1978 home. The homeowner already scraped and repainted their house but did not follow lead-safe work practices, leaving paint chips scattered throughout the landscaping. How best should I proceed?
A firm working on a property that is already contaminated with paint chips, dust, debris and residue must proceed by containing the work area for the renovation, and complying with all cleaning requirements under the Lead Renovation, Repair and Painting (RRP) Rule for that work area. Paint chips, dust, debris…
- Last published:
-
If I completed renovator training in an authorized state, what do I need to do to work for an EPA certified firm in EPA-administered jurisdictions?
Answer: There are no additional requirements. To become a certified renovator or certified dust sampling technician, an individual must successfully complete the appropriate course accredited by EPA or by an EPA-authorized state or tribal program. The course completion certificate serves as proof of certification. For a list of states, tribes…
- Last published:
-
Under the RRP Rule, do paint chips and debris need to be removed from protective sheeting even if such chips and debris can be effectively contained by the sheeting or the sealed container the sheeting is contained in for disposal?
Yes. After the renovation has been completed, the firm must clean the work area until no dust, debris, or residue remains. The first cleaning step required by the Lead Renovation, Repair, and Painting (RRP) Rule is to collect all paint chips and debris and, without dispersing any of it, seal…
- Last published:
-
When waste from renovations has been removed from the work area and placed in on-site storage, may the waste be stored in a covered waste container or must it all be bagged for disposal?
Properly implemented, either option can meet the requirements of the Lead Renovation, Repair and Painting (RRP) Rule . At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure, or behind…
- Last published:
-
Under section 80.1405, the standard for biomass based diesel (BBD) is calculated via a fraction, the numerator of which is equal to the RFV for BBD in compliance year i times 1.5. For 2010 only, would you agree that, using the example of the calculation f
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The percentage standard for biomass-based diesel in years 2011 and beyond will be based upon the volumes specified in CAA 211(o)(2)(B)(i)(IV), unless some portion of that volume is waived per CAA 211(o)(7)(E). For 2010, the numerator of the…
- Last published:
-
Are components removed from the home to be cleaned up and reused subject to the waste handling requirements in the rule?
Answer : While components to be reused rather than disposed of are not considered waste for the purposes of the Lead Renovation, Repair, and Painting (RRP) Rule , it is likely that, even if they do not contain lead-based paint, they are contaminated with dust or debris from the project…
- Last published:
-
The Renovation, Repair, and Painting (RRP) Rule requires HEPA vacuums to be used for cleaning up the dust created by renovations. What should I look for when purchasing a HEPA vacuum?
According to the definition in 40 CFR 745.83 : " HEPA vacuum means a vacuum cleaner which has been designed with a high-efficiency particulate air (HEPA) filter as the last filtration stage. A HEPA filter is a filter that is capable of capturing particulates of 0.3 microns with 99.97% efficiency…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, is composite sampling acceptable for clearance in lieu of cleaning verification?
Yes. Under the RRP Rule , cleaning verification need not be performed if the contract between the renovation firm and the person contracting for the renovation or another Federal, State, Territorial, Tribal or local law or regulation requires: The renovation firm to perform dust clearance sampling at the conclusion of…
- Last published: