Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 9 of 9 results
-
What if there is a gap in coverage of the GLEJGP?
EPA has set up national technical assistance centers (TCTACs), including one solely for tribes and tribal nations, that are geared towards communities. There are two in Region 5: one in Minneapolis and one in Chicago. The TCTACs are separate from this RFA ; however, they cover the entire Great Lakes…
- Last published:
-
What sources make up the Tier 1 categories used in the emissions trends?
Tier 1 categories are assigned by source classification codes (SCCs) that are the most specific processes available in the NEI. The latest SCC list with the Tier 1 assignments can be downloaded from the EPA SCC website in Comma Separate Values (CSV) format.
- Last published:
-
What is the cause of the large decrease in electric utility emissions, particularly sulfur dioxide, starting in 1995?
SO2 emissions reductions from utilities during this time are primarily attributed to the impacts of the acid rain program. As described on EPA’s Acid Rain Program web page, Phase 1 of this program began in 1995 and affected 263 units at 110 most coal-burning electric utility plants in 21 eastern…
- Last published:
-
Does EPA have a minimum threshold/definition for the Regional scale program? In other words, what does Regional mean or is it open to applicants to determine at any scale?
GLNPO wants to be extremely flexible and encourage PRs to think about which regions they could expect to effectively cover when creating their application. There are no additional criteria from EPA on how big or small the Project RFA should be.
- Last published:
-
Could a regional application, include an entire state?
Yes, with the caveat that the entire state must fall within the historic bounds of the Great Lakes basin. For example, if the Principal Recipient is proposing a GLEJGP for the state of Illinois, projects may fall in the portion of the state within the Great Lakes basin, but not…
- Last published:
-
Why do mobile source NOx emissions jump higher between 2001 and 2002 on the emissions trends?
The emissions model used for mobile sources changed from MOBILE6.2 to MOVES 2010 in December 2009. This change included a notable increase in NOx emissions. The EPA adjusted data back to 2002 to reflect the change in models. The higher emissions in 2002 are because of this method change and…
- Last published:
-
Why do the PM2.5 emissions for the electric utilities source category jump up between 1998 and 1999?
The estimation method for PM emissions from fuel combustion sources was enhanced beginning with the 1999 National Emissions Inventory. Prior to 1999, the emissions measurement data methodology only included the filterable portion (which means the solid particle matter at elevated stack temperatures). Beginning with the 1999 NEI, both the filterable…
- Last published:
-
Does funding through this grant include municipalities within the Chicago River watershed?
Yes, including the historic Chicago River watershed.
- Last published:
-
Will basin wide PR serve areas without a designated PR for smaller part of the region, or will their service areas overlap?
If the Project RFA will be serving the entire basin, I.e., a basin-wide GLEJGP, this could be delegated within a coalition (if it is a coalition that has applied). Otherwise, the PR organization will be serving the entire basin. If there is a basin-wide PR as well as a smaller…
- Last published: