Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Information for Do-It-Yourselfers Total results: 1
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing Painted Components Total results: 6
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 24 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment ( 71 FR 77266 ). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC requirements to provide general…
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above…
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with the alternative measures in section 112.7(d).
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from oil transfers into or from the mobile refueler. The general…
- Last published:
-
If a certified inspector or risk assessor determines that a component was installed post-1978 and is therefore free of lead-based paint, can the renovation firm rely on this determination?
Yes, as long as the renovation firm has obtained a copy of the determination. The firm must retain a copy of the determination for three years after completion of the renovation. Question Number: 23002-18218 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Eligibility for qualified oil-filled operational equipment in event of a discharge
Does a facility automatically lose eligibility for the option for qualified oil-filled operational equipment if the equipment has an oil discharge? No. Facilities that choose this alternative and later have a reportable oil discharge from qualified oil-filled operational equipment do not automatically lose eligibility. However, the spill reporting requirements would…
- Last published:
-
Can qualified facilities also use the alternative requirements for qualified oil-filled operational equipment?
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self-certify the SPCC Plan and is not required to have a PE develop…
- Last published:
-
Is a lead-based paint inspection sufficient to determine compliance with requirements of the RRP rule?
Question: Is a lead-based paint inspection, performed by a certified inspector or risk assessor, that includes a written determination that various building components are free of paint or other surface coatings containing lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight sufficient…
- Last published:
-
When testing a property for the presence of lead prior to beginning a renovation using an EPA-recognized lead test kit, must I test every component affected by the renovation?
Answer: Yes. Because certified renovator training does not cover sampling protocols, certified renovators using EPA-recognized lead test kits or performing paint chip sampling to determine the applicability of the RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does…
- Last published:
-
Secondary containment calculations in SPCC Plan
The SPCC regulations in 40 CFR §112.7(c) require facilities to provide appropriate containment or diversionary structures or equipment to prevent discharges as described in §112.1(b). Does a facility's SPCC Plan have to include calculations to demonstrate compliance with the §112.7(c) general secondary containment requirements? EPA does not require facilities to…
- Last published:
-
What are the specifications for bulk storage secondary containment systems?
For purposes of the SPCC requirements, "secondary containment for bulk storage facilities must be constructed to at least provide for the capacity of the largest single tank with sufficient freeboard for precipitation. EPA believes that the proper standard of "sufficient freeboard" to contain precipitation is that amount necessary to contain…
- Last published:
-
What are the amended requirements for oil-filled operational equipment?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Inspection or monitoring program requirements when using alternative secondary containment for oil-filled operational equipment
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
I am an owner/agent for an apartment community built prior to 1978. In 2004, testing of a random sample of units were negative for lead paint but positive for lead dust. With the positive lead dust result, are we required to comply with the RRP Rule?
No. As long as the determination that the units are free of lead-based paint was made by an inspector or risk assessor certified by EPA or by an authorized State or Tribal program, renovations in the building are not covered by the Lead Renovation, Repair, and Painting (RRP) Rule…
- Last published: