Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Information for Owners and Managers of Buildings that Contain Asbestos
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 16 - 30 of 34 results
-
May an Asbestos Model Accreditation Plan (MAP) training provider combine students from different disciplines in order for these students to attend special training modules on selected topics, such as health effects?
No. Each initial and refresher training course offered for accreditation must be specific to a single discipline and not combined with training for any other discipline. Also, a person seeking accreditation in any of the five accredited Asbestos Model Accreditation Plan (MAP) disciplines cannot attend two or more courses concurrently…
- Last published:
-
Is it possible to complete in-house training for purposes of Asbestos Model Accreditation Plan (MAP) accreditation?
Yes, as long as the training entity has approval for each of its accredited courses from either EPA or a state program at least as stringent as the MAP. These training programs, however, are subject to audit by the Environmental Protection Agency (EPA) and/or the state in the same way…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
I use/used vermiculite to enhance my potting soil. Should I be concerned?
EPA's investigation ( https://www.epa.gov/asbestos/protect-your-family-asbestos-contaminated-vermiculite-insulation ) into these products indicates that consumers face only a minimal health risk from using vermiculite products at home or in their gardens. To further reduce the risk associated with the occasional use of vermiculite products during gardening activities, EPA recommends that consumers: Use vermiculite outdoors…
- Last published:
-
Does the Asbestos Model Accreditation Plan (MAP) require that a written design plan be prepared by an accredited project designer before a covered response action begins inside a school or public and commercial building?
No, the MAP does not explicitly mandate written design plans for covered response actions in a school or public and commercial building. However, EPA strongly recommends preparation of a written design plan before undertaking a response action. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information…
- Last published:
-
Can an Asbestos Model Accreditation Plan (MAP)-accredited Contractor/Supervisor exchange that accreditation for Worker accreditation without further training?
Yes. 40 CFR part 763, subpart E, Appendix C, Unit I.B.1. of the Asbestos Model Accreditation Plan permits accredited contractor/supervisors to “perform in the role of a worker without possessing separate accreditation as a worker.” Therefore, if a state wishes to permit its accredited contractor/supervisors to relinquish their certificates in…
- Last published:
-
Does the Asbestos Model Accreditation Plan (MAP) require that a design plan be prepared by an accredited project designer before covered response actions begin inside a school or public and commercial building?
The MAP stipulates that a person must be accredited as a project designer to design any of the following activities with respect to friable asbestos-containing building material (ACBM) in a school or public and commercial building: (1) a response action other than a SSSD maintenance activity, (2) a maintenance activity…
- Last published:
-
Do accreditation requirements under the Asbestos Model Accreditation Plan (MAP) apply to persons removing nonfriable asbestos-containing material from schools?
No, unless the nonfriable material becomes friable in the removal process. Generally, if a removal action involves nonfriable materials and the work methods used in removal of the nonfriable material will not cause it to become friable by the material crumbling, becoming pulverized or to be reduced to powder by…
- Last published:
-
If I take an 8-hour refresher training course under the Asbestos Model Accreditation Plan (MAP) from an asbestos training provider who fraudulently claimed to be accredited to conduct such training, do I need to retake the 8-hour refresher training?
Yes. You must retake the 8-hour refresher training course in order to have your accreditation status reinstated. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated Vermiculite Insulation
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Is a state agency in violation of asbestos regulations pursuant to the Asbestos Hazard Emergency Response Act (AHERA) if it chose, as a matter of policy, not to consider asbestos in its safety inspections?
The Asbestos Hazard Emergency Response Act (AHERA) does not require that public and commercial buildings be inspected for asbestos. If the owner/operator of such a building elected to have an inspection performed, then the inspection must be performed by an accredited individual. If the owner/operator of such a building undertakes…
- Last published:
-
Are persons who collect asbestos bulk samples on an infrequent or occasional basis subject to Asbestos Model Accreditation Plan (MAP) inspector accreditation requirements?
Yes. Persons who collect asbestos bulk samples for the purpose of using those samples to determine the presence or location of asbestos containing building materials (ACBM) or to determine the condition of ACBM must be accredited as inspectors. The frequency at which these samples are taken is not a factor…
- Last published:
-
How do I get certified as an asbestos professional?
To become a properly trained and accredited asbestos professional you will need to seek training from a training provider that offers courses approved by the EPA or a state to conduct asbestos training pursuant to the Asbestos Model Accreditation Plan. Most states also require a license to perform this work…
- Last published:
-
When conducting an asbestos abatement operation that is not a small-scale, short-duration project, what amount of asbestos-containing material triggers the requirement to use Asbestos Model Accreditation Plan-accredited workers?
Response actions other than a small-scale, short-duration project must be designed and conducted by Asbestos Model Accreditation Plan (MAP)-accredited persons. See 40 CFR part 763.90(g). Additionally, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), Occupational Safety and Health Administration (OSHA), state and local training requirements may apply. Other…
- Last published:
-
When reviewing an Asbestos Model Accreditation Plan (MAP) course completion certificate, what are the identifying characteristics to ensure that the certificate is from a certified instructor presenting a certified course?
Training providers (or a state, directly) must issue unique numbered certificates to students who pass a particular training course examination. The numbered certificate should include the name of the student and the course completed, the dates of the course and the examination, a statement indicating that the student completed the…
- Last published: