Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Renovator Certification and Training Total results: 12
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Renovator Certification and Training
- Sampling Process
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 27 results
-
What does it mean when EPA finds contamination that “exceeds screening levels?”
Screening levels are not the same as cleanup or action levels. An exceedance of a screening level indicates the need for additional evaluation, potentially including a site-specific risk assessment.
- Last published:
-
If EPA finds any contamination associated with the Norwood Landfill site that “exceeds” what is considered safe, will EPA clean up that contamination - even if the Agency cannot find any “pathways” for that contamination to reach humans or sensitive environments?
If the sampling data shows an exceedance of a screening level, EPA will consult with the site Toxicologist and the Agency for Toxic Substances and Disease Registry (ATSDR) to conduct a human health risk screening assessment to determine any potential threat to human health. EPA will also consult with the…
- Last published:
-
How do you know you are not missing some areas that might be contaminated?
EPA uses all credible information available, including community input, regarding the boundaries and geographic areas of waste that may have been deposited or where contaminated soil may have been placed. The team selects its sampling locations based on those areas and consults historic aerial images that help depict those boundaries.
- Last published:
-
Will EPA sample the Glenolden Laboratory property?
The former Glenolden Laboratory property located on South Avenue is a separate site. The previous owners conducted a voluntary cleanup pursuant to the Pennsylvania Department of Environmental Protection’s (PADEP) Environmental Cleanup Program, known as Act 2. Concerns regarding remedial actions conducted under Act 2 should be directed to PADEP as…
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
Can renovator training courses, both initial and refresher courses, be taught online or via distance learning?
Answer: The final Renovation, Repair and Painting regulation, like the abatement program, permits the use of alternative training techniques (e.g., video training, computer-based training) as a supplement to the hands-on skills assessment, or as a substitute for the lecture portion of the training course requirements outlined in § 745.225. In…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is the certified renovator assigned to a specific project responsible for the work practices of other contractors on the project if the certified renovator is an employee of the general contractor of the project?
All firms performing renovations must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator. A firm acting as a general contractor may satisfy this requirement by hiring another certified firm that takes responsibility for ensuring…
- Last published:
-
What about a situation where the homeowner is acting as their own general contractor and hires multiple companies to do different portions of the work? In this situation, would each business participating be required to follow the rules and assign a separate certified renovator to supervise their portion of the work including separate containment?
Answer: While the homeowner may be performing the role of general contractor by hiring firms and organizing their work, the homeowner is not performing, offering, or claiming to perform a renovation and therefore does not need to be a certified firm. The firms hired by the homeowner to perform renovation…
- Last published:
-
The certified renovator is required to have proof of their certification at the work site. If the certified renovator provides on-the-job training to workers, does there need to be documentation of that training at the work site too?
Answer: No. Certified renovators must have with them at the work site copies of their initial course completion certificate and their most recent refresher course completion certificate. Certified renovators are also responsible for providing training to non-certified workers on the work practices they will be using in performing their assigned…
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
What questions was EPA trying to find answers to during its first round of sampling at the Norwood Landfill site?
The main question that EPA seeks to answer is whether the identified waste areas warrant consideration for placement of the Site on the National Priorities List (NPL) or Superfund List. In the first round of sampling, EPA collected surface soil samples (0-2 feet) from the landfill property, and surface water…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
Will EPA conduct sampling in local parks in the Norwood community?
EPA will sample Norwood Park because of its close proximity to the Old Norwood Dump and Norwood Landfill. There is no current information that would warrant sampling in other parks.
- Last published:
-
Is EPA planning on taking samples from the basements in the homes you are sampling in the Norwood community? If not, why not?
EPA is not planning to collect samples from residential basements or crawl spaces at this time. EPA installed six groundwater wells within the Old Norwood Dump, Norwood Lower Park, and the Winona Homes neighborhood. Groundwater wells will not be placed on private residential properties. The wells will be used to…
- Last published: