Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Minor Repair and Maintenance Activities
- Site Assessment Process
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 21 results
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
My firm installs carpets. Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is. How do I know when I need to comply with the Lead Renovation, Repair and Painting (RRP) Rule?
If when installing the carpet, you disrupt six square feet or less of painted surface per room, the job is not covered by the RRP Rule . Question Number: 23002-19749 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
What is the key question EPA tries to answer through a site investigation?
Findings of the site investigation determine what hazardous substances may be present, whether they may be released to the environment, and any potential threat to human health. Information about the site that is collected in the preliminary assessment and site investigation phase helps EPA to evaluate the risks posed by…
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Please provide guidance on how the Agency will interpret the term “minor repair and maintenance activities.”
Answer: “Minor repair and maintenance” is defined in 40 CFR 745.83 as activities that disrupt less than 6 square feet or less of painted surface per room for interior activities or 20 square feet or less of painted surface for exterior activities where none of the work practices prohibited or…
- Last published:
-
Does the minor maintenance exception mean that if I drill one-inch holes in a painted surface to blow insulation into an enclosed wall cavity, I could drill 864 holes in the interior or 2880 holes on the exterior before I had to comply with the RRP Rule?
The exception is based on the area of paint disrupted, which in this example is based on the combined areas of the holes drilled in the wall. Question Number: 23002-15677 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program…
- Last published:
-
In a multi-family building, does the standard for interiors of six square feet or less, or the standard for exteriors of 20 square feet or less of disrupted painted surface apply to the whole building or can it be applied to each separate unit?
For interiors, the exception for work that disrupts six square feet or less of painted surface applies to each individual room and is inclusive of all work done in the room in any 30-day period. For exteriors, to qualify for the exception for minor repair and maintenance activities, the total…
- Last published: