Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 26 results
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
For purposes of cleaning the work area following a renovation, is the interior floor of a garage considered interior or exterior space?
In general, the interior floor of a garage is considered an interior space for purposes of post-renovation cleanup. EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are…
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
The authorship of the proposal can be co-written and co-submitted by a coalition. However, how can organizations document the budget? Do coalitions complete several line items budget for each of the members of the coalition and a budget narrative tying them all together? Do coalition members submit one line-item budget and all the coalition members who are not the PR will have a single item listed in the “other” category?
There should be one detailed budget narrative covering the entire project. Whoever is submitting the proposal and responsible for managing the agreement would provide their budget and all the object class categories that you are used too: personal, fringe, travel, equipment, supplies, contracting, and other. The other coalition members, if…
- Last published:
-
My firm is replacing windows on a pre-1978 home. The homeowner already scraped and repainted their house but did not follow lead-safe work practices, leaving paint chips scattered throughout the landscaping. How best should I proceed?
A firm working on a property that is already contaminated with paint chips, dust, debris and residue must proceed by containing the work area for the renovation, and complying with all cleaning requirements under the Lead Renovation, Repair and Painting (RRP) Rule for that work area. Paint chips, dust, debris…
- Last published:
-
Under the RRP Rule, do paint chips and debris need to be removed from protective sheeting even if such chips and debris can be effectively contained by the sheeting or the sealed container the sheeting is contained in for disposal?
Yes. After the renovation has been completed, the firm must clean the work area until no dust, debris, or residue remains. The first cleaning step required by the Lead Renovation, Repair, and Painting (RRP) Rule is to collect all paint chips and debris and, without dispersing any of it, seal…
- Last published: