Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos and School Buildings Total results: 94
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Definition of "Renovation" Total results: 17
- Child-Occupied Facilities Total results: 5
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 31 - 45 of 111 results
-
How many samples of miscellaneous material or nonfriable suspected material must be taken to determine if the material is asbestos-containing material (ACM) under the Asbestos Hazard Emergency Response Act (AHERA)?
For miscellaneous material, 40 CFR part 763.86(c) states that “in a manner sufficient to determine whether material is asbestos-containing material (ACM) or not ACM, an accredited inspector shall collect bulk samples from each homogeneous area of friable miscellaneous material that is not assumed to be ACM.” Although a specific number…
- Last published:
-
How often must school custodial staff complete the 2-hour or 14-hour asbestos awareness training under the Asbestos Hazard Emergency Response Act (AHERA)?
40 CFR part 763.92(a) requires LEAs to train custodians and maintenance workers “within 60 days after commencement of employment.” Although the asbestos in schools rule does not require refresher training for custodial staff and maintenance workers, the OSHA construction standard regulations (29 CFR 1926.1101(k)(9)(ii)) and OSHA regulations for most other…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), must the accredited management planner review the inspector's written assessment?
Yes. 40 CFR part 763.88(d) of the asbestos-containing materials in schools rule requires that the accredited management planner “review the results” of inspections, assessments, and reinspections and “conduct any other necessary activities in order to recommend in writing to the local education agency (LEA) appropriate response actions.” Other Frequent Questions…
- Last published:
-
Please clarify the the term "homogeneous area," under the Asbestos Hazard Emergency Response Act (AHERA), which has a regulatory definition of being uniform in color or texture, when applied to pipe lagging that's been discolored or applied differently.
A certain number of bulk samples (based on the size of the area) are required for each homogeneous area as described at 40 CFR part 763.86(a). The accredited inspector must make a judgment on whether pipe lagging is indeed uniform in color and texture, and therefore a homogeneous area. If…
- Last published:
-
Pursuant to the Asbestos Hazard Emergency Response Act (AHERA), can a local education agency (LEA) store a management plan in electronic format (e.g., CD ROM)?
The asbestos in schools rule does not specifically prohibit LEAs from storing records in electronic format. However, such records must be available to the public, without cost or restriction on request in the LEAs administrative office and from each school’s individual administrative office within 5 working days after the request…
- Last published:
-
I found out that my child's school has asbestos in it. Is there a risk to him (her)?
If done properly, asbestos-containing material that is in good condition can be safely managed in place. Local education agencies (e.g. , school districts) are required under the asbestos-containing materials in schools rule, pursuant to the Asbestos Hazard Emergency Response Act (AHERA), to inspect for and manage asbestos containing materials properly…
- Last published:
-
Are renovations that disturb stucco subject to the RRP Rule? Does it matter whether the stucco has been painted?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. Therefore, renovations that disturb stucco are subject to the RRP Rule only if the stucco has been painted. Question Number: 23002-14025 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are Department of Energy weatherization projects covered under the RRP Rule?
Answer : The Lead Renovation, Repair, and Painting (RRP) Rule defines “renovation” to include weatherization projects such as cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, and planing thresholds to install weather stripping. Other types of weatherization projects, such as window replacement, are…
- Last published:
-
If I am painting a wall on which there are multiple coats of latex paint over the old lead-based paint and the paint is not peeling down to the lead paint level must I comply with the new Renovation, Repair, and Painting (RRP) regulations?
Yes, if the painted surface of the wall will be disturbed by the renovation. Question Number: 23002-18485 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a homeowner removes all the painted surfaces in a room and then hires a certified firm to remodel the room, does the renovator need to follow the RRP Rule?
No. Projects that do not disturb a painted surface are not subject to the RRP Rule. Question Number: 23002-18301 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), are five transmission electron microscopy (TEM) outside air samples required to be collected with the five inside and the two blanks if the inside samples and blanks are below 70 structures/mm2?
The five outdoor samples must be collected in addition to the five indoor samples, the two field blanks, and the one sealed blank for a total of thirteen air samples. (40 CFR part 763.90(i)(3)) If the five inside samples are below 70 structures/mm2 and the volume of air used for…
- Last published:
-
Are churches or sanctuaries that are under the local education agency's (LEA's) authority, which are attended by students for religious worship purposes during normal school hours, required to be inspected?
If the church is not used for school instruction (e.g., math, spelling, etc.) purposes, no. However, when the church is under the authority of an local education agency (LEA) and is used for school instruction it must be inspected and included in the management plan. (Asbestos Hazard Emergency Response Act…
- Last published:
-
Are there criteria under the Asbestos Hazard Emergency Response Act (AHERA) for doing aggressive asbestos air monitoring?
Yes. Unit III.B.7.d. of Appendix A to 40 CFR part 763, subpart E provides criteria for aggressive air monitoring. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated…
- Last published:
-
A school uses a single room in a non-school building on a regular basis as a classroom for elementary and secondary education purposes during regular school hours. Is the room covered by the asbestos-containing materials in schools rule?
The single room used by the school on a regular basis as a classroom is covered by asbestos-containing materials in schools rule (40 CFR part 763, subpart E), in addition to the hallways and bathrooms used by the school children. However, the rest of the building is not covered. Other…
- Last published:
-
A school building burns down. A local education agency (LEA) wants to use a local community center under the authority of an LEA for 6 months due to the emergency. Does this temporary school building have to be inspected?
Yes. 40 CFR part 763.85(a)(2) of the asbestos in schools rule states that, “[i]n the event that emergency use of an uninspected building as a school building is necessitated, such buildings shall be inspected within 30 days after commencement of such use.” Other Frequent Questions about Asbestos Learn About Asbestos…
- Last published: