Search Frequent Questions
Filter By:
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos and School Buildings Total results: 94
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 61 - 75 of 242 results
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
Are local education agencies relieved of reinspections once every 3 years for schools which are asbestos-free, either because they were constructed without asbestos-containing building material (ACBM) or because all ACBM has been removed?
Yes, because the reinspection requirements at 40 CFR section 763.85(b) apply only to schools which contain known or assumed ACBM. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos…
- Last published:
-
Could miscellaneous asbestos-containing building material (ACBM) on the floors of two identical classrooms on two separate floors be viewed as homogeneous areas?
No. This would not be a homogeneous area, which is defined as “an area of surfacing material, thermal insulation material, or miscellaneous material that is uniform in color and texture.”[40 CFR part 763.83] Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers…
- Last published:
-
Are schools within a local education agency with no asbestos-containing building material (ACBM) relieved of the annual notification requirements at 40 CFR part 763.84(c)?
Yes. However, the annual notification regarding the availability of the school's management plan must continue indefinitely to parent, teacher, and employee organizations (or, in the absence of any such organizations, to the relevant group) (see sections 40 CFR part 763.84(f) and 40 CFR part 763.93(g)(4)). Copies of these annual notices…
- Last published:
-
Are vocational schools covered under the Asbestos Hazard Emergency Response Act (AHERA)?
Vocational schools that provide elementary or secondary education under state law are covered as schools under AHERA. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated Vermiculite Insulation
- Last published:
-
If friable asbestos-containing material (ACM) is accidentally left behind after an abatement project had passed air clearance by transmission electron microscopy (TEM) analysis, do I need to re-test the air?
Yes. Both the visual inspection and the abatement were not properly completed under 40 CFR part 763.90(i)(1). The loose debris should be removed and the area thoroughly re-cleaned. Air monitoring should be repeated using TEM analysis for the functional space where the original abatement occurred. (40 CFR part 763.90(f) and…
- Last published:
-
What is split sampling?
Split sampling is a technique where multiple samples are collected from the same location at the same time and then sent to separate laboratories for analysis. Checking to see if the labs get the same or similar results is a way to determine the accuracy of the data. If there…
- Last published:
-
Are the trucks leaving the derailment site spreading contamination?
Each truck leaving the derailment site that is carrying contaminated waste is checked to ensure all material is safely secured. Also, all trucks go through a washing process before departing the site. The washing process ensures the vehicles’ wheels and undercarriage are free of dirt and mud. Street sweepers are…
- Last published:
-
The asbestos-containing materials in schools rule pursuant to the Asbestos Hazard Emergency Response Act (AHERA) requires that an accredited management planner review the results of each inspection and assessment. Is this also required for reinspections?
Yes. 40 CFR part 763.88(d) of the asbestos in schools rule states that “[t]he local education agency shall select a person accredited to develop management plans to review the results of each inspection, reinspection, and assessment . . . ” Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and…
- Last published:
-
If the architect or project engineer responsible for the construction of a school building built after October 12, 1988 provides a written statement that there is no asbestos-containing material in the school, is an inspection required?
40 CFR part 763.99(a) and (a)(7)of the asbestos-containing materials in schools rule provides that an LEA “shall not be required to perform an inspection under § 763.85(a) in any sampling area . . . or homogeneous area of a school building where: . . . (7) An architect or project…
- Last published:
-
What is an asbestos management plan?
An asbestos management plan is required to provide documentation of the recommended asbestos response actions, the location of asbestos within the school, and any action taken to repair or remove the material. The school authority must maintain records to be included in the Asbestos Management Plan. These records include among…
- Last published:
-
Is it dangerous to have asbestos containing material in my school?
Not necessarily. Undamaged asbestos that is properly managed in place poses little health risk to students, teachers and other school occupants. However, it is important that the proper school designated authorities regularly inspect the condition of asbestos-containing materials to ensure they remain intact. Asbestos can pose a health hazard when…
- Last published:
-
What were the results from the phase 1 of soil sampling?
Phase 1 of soil sampling is complete, and we have received most of the preliminary data. The vast majority of results are within typical ranges for soil. Samples taken on private properties are all within typical soil levels, and only a few samples taken along public right-of-way (next to roads…
- Last published:
-
Can I grow a garden at home or plant crops?
Yes. You can continue to use your land as you normally would. Residential soil sampling results are within typical ranges for the area. Follow normal measures like peeling root vegetables and washing leafy greens.
- Last published: