Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos and School Buildings Total results: 94
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Livestock and pet health impacts Total results: 1
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 31 - 45 of 95 results
-
How often must school custodial staff complete the 2-hour or 14-hour asbestos awareness training under the Asbestos Hazard Emergency Response Act (AHERA)?
40 CFR part 763.92(a) requires LEAs to train custodians and maintenance workers “within 60 days after commencement of employment.” Although the asbestos in schools rule does not require refresher training for custodial staff and maintenance workers, the OSHA construction standard regulations (29 CFR 1926.1101(k)(9)(ii)) and OSHA regulations for most other…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), must the accredited management planner review the inspector's written assessment?
Yes. 40 CFR part 763.88(d) of the asbestos-containing materials in schools rule requires that the accredited management planner “review the results” of inspections, assessments, and reinspections and “conduct any other necessary activities in order to recommend in writing to the local education agency (LEA) appropriate response actions.” Other Frequent Questions…
- Last published:
-
Please clarify the the term "homogeneous area," under the Asbestos Hazard Emergency Response Act (AHERA), which has a regulatory definition of being uniform in color or texture, when applied to pipe lagging that's been discolored or applied differently.
A certain number of bulk samples (based on the size of the area) are required for each homogeneous area as described at 40 CFR part 763.86(a). The accredited inspector must make a judgment on whether pipe lagging is indeed uniform in color and texture, and therefore a homogeneous area. If…
- Last published:
-
Pursuant to the Asbestos Hazard Emergency Response Act (AHERA), can a local education agency (LEA) store a management plan in electronic format (e.g., CD ROM)?
The asbestos in schools rule does not specifically prohibit LEAs from storing records in electronic format. However, such records must be available to the public, without cost or restriction on request in the LEAs administrative office and from each school’s individual administrative office within 5 working days after the request…
- Last published:
-
I found out that my child's school has asbestos in it. Is there a risk to him (her)?
If done properly, asbestos-containing material that is in good condition can be safely managed in place. Local education agencies (e.g. , school districts) are required under the asbestos-containing materials in schools rule, pursuant to the Asbestos Hazard Emergency Response Act (AHERA), to inspect for and manage asbestos containing materials properly…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), are five transmission electron microscopy (TEM) outside air samples required to be collected with the five inside and the two blanks if the inside samples and blanks are below 70 structures/mm2?
The five outdoor samples must be collected in addition to the five indoor samples, the two field blanks, and the one sealed blank for a total of thirteen air samples. (40 CFR part 763.90(i)(3)) If the five inside samples are below 70 structures/mm2 and the volume of air used for…
- Last published:
-
Are churches or sanctuaries that are under the local education agency's (LEA's) authority, which are attended by students for religious worship purposes during normal school hours, required to be inspected?
If the church is not used for school instruction (e.g., math, spelling, etc.) purposes, no. However, when the church is under the authority of an local education agency (LEA) and is used for school instruction it must be inspected and included in the management plan. (Asbestos Hazard Emergency Response Act…
- Last published:
-
Are there criteria under the Asbestos Hazard Emergency Response Act (AHERA) for doing aggressive asbestos air monitoring?
Yes. Unit III.B.7.d. of Appendix A to 40 CFR part 763, subpart E provides criteria for aggressive air monitoring. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated…
- Last published:
-
A school uses a single room in a non-school building on a regular basis as a classroom for elementary and secondary education purposes during regular school hours. Is the room covered by the asbestos-containing materials in schools rule?
The single room used by the school on a regular basis as a classroom is covered by asbestos-containing materials in schools rule (40 CFR part 763, subpart E), in addition to the hallways and bathrooms used by the school children. However, the rest of the building is not covered. Other…
- Last published:
-
A school building burns down. A local education agency (LEA) wants to use a local community center under the authority of an LEA for 6 months due to the emergency. Does this temporary school building have to be inspected?
Yes. 40 CFR part 763.85(a)(2) of the asbestos in schools rule states that, “[i]n the event that emergency use of an uninspected building as a school building is necessitated, such buildings shall be inspected within 30 days after commencement of such use.” Other Frequent Questions about Asbestos Learn About Asbestos…
- Last published:
-
I work for a commercial lab and have questions on how to report the results of asbestos analysis for a local education agency (LEA). Who should I talk to?
You can contact the National Institute of Standards and Technology’s (NIST’s) National Voluntary Lab Accreditation Program (NVLAP) at (301) 975-4016 or at [email protected] . Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from…
- Last published:
-
If vermiculite insulation bulk samples analyzed by standard polarized-light microscopy (PLM) analysis is found to be less than 1% asbestos is it still considered an asbestos-containing material under the Asbestos Hazard Emergency Response Act (AHERA)?
Vermiculite insulation containing less than 1 percent asbestos does not qualify as asbestos containing material (ACM) under AHERA and the asbestos-containing materials in schools rule. If standard PLM analysis, ensuring that bulk samples comply with sampling requirements as laid out in 40 CFR part 763.86 and that subsequent analysis of…
- Last published:
-
If my school does not have any known or assumed asbestos containing building materials (ACBM), do I need to reinspect?
No. Only schools that contain friable and non-friable known or assumed ACBM must be reinspected once every 3 years. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated…
- Last published:
-
What should a school do if it finds thermal system insulation (TSI) in a ceiling space, pursuant to the Asbestos Hazard Emergency Response Act (AHERA)?
If the space in which the TSI is discovered has never been inspected in accordance with the Asbestos Hazard Emergency Response Act (AHERA) inspection requirements, then such an inspection must be undertaken and should focus on all such previously unexpected space above a drop ceiling in which TSI is present…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), do you have to label enclosed or encapsulated asbestos-containing building material ACBM in routine maintenance areas?
Yes. 40 CFR part 763.95(a) of the asbestos in schools rule states that “[t]he local education agency shall attach a warning label immediately adjacent to any friable and non-friable ACBM and suspected ACBM assumed to be ACM located in routine maintenance areas (such as boiler rooms) at each school building…
- Last published: