Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Information for Owners and Managers of Buildings that Contain Asbestos
- Active Mining vs Superfund Site
- Administrative
Displaying 1 - 15 of 63 results
-
If an Asbestos Hazard Emergency Response Act (AHERA) accredited-training course is taught by someone other than instructors certified by the state or the Environmental Protection Agency (EPA), can an approved contractor/instructor sign certificates?
No. An EPA Asbestos Hazard Emergency Response Act (AHERA) accredited training course must be taught by EPA/state approved instructors and only those approved instructors may issue AHERA approved training course certificates. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings…
- Last published:
-
Is there a formal requirement that an Asbestos Model Accreditation Plan (MAP) asbestos training course must have a training manual?
Accredited trainers are not required to have a formal training manual, per se. According to the Asbestos Model Accreditation Plan (MAP), at Unit III, (A)(3), (A)(4)(d) and (A)(5) of appendix C to 40 CFR part 763, subpart E, a trainer’s application for course approval must include the course curriculum, a…
- Last published:
-
What are the requirements under the Asbestos Hazard Emergency Response Act (AHERA) for refresher training for a person who wants to "step down" his/her certification from contractor/supervisor status to worker status?
If such a person takes contractor/supervisor refresher courses on an annual basis, that person may perform in both the contractor/supervisor and worker roles. If, however, the person chooses only to take annual worker refresher courses, that person may continue to act in the role of an accredited worker but loses…
- Last published:
-
What is the applicability of Federal asbestos inspector accreditation requirements under the Asbestos Hazard Emergency Response Act (AHERA) to real estate appraisers?
Real estate appraisers may not assess the suspected presence, location, or condition of asbestos in a school building or a public and commercial building during an appraisal unless they are accredited pursuant to the Toxic Substances Control Act (TSCA) and the Asbestos Model Accreditation Plan (MAP), as conducting an examination…
- Last published:
-
When would a conflict of interest exist among Asbestos Model Accreditation Plan (MAP)-accredited personnel?
A conflict of interest with respect to Asbestos Model Accreditation Plan (MAP)-accredited personnel would exist if, for example, the management planner and abatement contractor worked for the same firm. The planner might recommend to the LEA more expensive response actions than are necessary in the management plan. Other Frequent Questions…
- Last published:
-
The training requirements specified in 40 CFR part 763 appear to apply to projects (excluding small-scale, short-duration projects) involving interior building components. Specifically, is roofing work and other exterior work covered?
Worker training requirements specified in 40 CFR part 763, including those for accreditation under the Asbestos Model Accreditation Plan (MAP), apply to interior building projects done in schools and public and commercial buildings. Additionally, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), Occupational Safety and Health Administration (OSHA)…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Could an organization in the coalition be a Project Subrecipient if there is a conflict-of-interest policy in place?
Full Question If we develop a conflict-of-interest policy and require recusal from evaluating or prioritizing projects where a conflict arises, would this allow EJ orgs to submit projects for funding even if they are getting paid to advise on the structure and process for the re-grant program and participation in…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How does a company become a provider of Asbestos Model Accreditation Plan (MAP)-accredited asbestos training courses?
Individuals or groups wishing to sponsor training courses for disciplines required to be accredited under section 206(b)(1)(A) of the Toxic Substances Control Act (TSCA) may apply for approval from states that have accreditation program requirements that are at least as stringent as the EPA Asbestos Model Accreditation Plan (MAP). For…
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published:
-
Is there an expectation on whether small subawards, for ~ $50K, or large subawards, for ~$750K are preferable? For example, a large subaward could be the only thing a regional PR could award if they ask for the minimum of $2,000,000.
The RFA does not state a preference for the size of the subaward, so long as the subaward is within the $50,000 to $750,000 limit. GLNPO will look to applicants to describe the program to be carried out and why this amount of subaward funding makes sense for their specific…
- Last published:
-
Can letters of support be emailed directly to EPA?
Only materials submitted as part of the grant application submitted on Grants.gov will be considered. If supporters wish to send letters directly to EPA, they may email ( [email protected] ). However, for them to be considered with the application, the applicant organization should be copied on those email messages with…
- Last published:
-
Can Asbestos Model Accreditation Plan (MAP)-accredited workers and/or contractor/supervisors collect asbestos bulk samples for the purpose of inspection if they have not obtained separate inspector accreditation?
No, accredited workers and contractor/supervisors are not accredited to perform inspections and must obtain separate inspector accreditation in order to collect bulk samples in order to determine the presence or location of asbestos-containing building materials. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners…