Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- Waste disposal and containment Total results: 13
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Testing for Lead Total results: 19
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 44 results
-
How is waste leaving the derailment site tracked?
EPA on-scene coordinators are assigned to track liquid–and solid–waste trucks entering and leaving the derailment site. They log every truck, oversee the loading and covering of waste, truck washing and weighing, and the proper placement of placards. Responders take pictures throughout the process. All trucks go to approved and regulated…
- Last published:
-
What happens after the track work is completed?
The track work has been the highest priority to remove most contamination as early as possible. This, plus preventing the spread of contamination by capturing water from the site and constructing a bypass of Sulphur Run around the site will continue into June. While track work and water management continue…
- Last published:
-
What does the on-site wastewater treatment process on site entail?
EPA has approved a workplan to allow Norfolk Southern to treat hazardous wastewater on-site, removing vinyl chloride and other contaminants to dispose of the treated wastewater off-site as a non-hazardous waste. Currently, the train derailment site generates nearly one million gallons of wastewater per week from the collection of stormwater…
- Last published:
-
Where is the treated wastewater going?
The wastewater treatment system removes derailment contaminants using several steps, including sedimentation and filtration. The treated wastewater is then tested to verify vinyl chloride is below the drinking water standard. Once treated, water is sent to facilities certified to accept non-hazardous wastewater and that are regulated by federal and state…
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
How much waste was removed as part of the cleanup efforts?
In late October, EPA announced the completion of major derailment site excavation. Remaining contaminated soil and debris were removed for off-site treatment or disposal. Contact water continues to be treated in an on-site wastewater treatment system prior to removal for off-site disposal. As of November 13, over 174,000 tons of…
- Last published:
-
When testing a work area, does one lead test kit or paint chip sample suffice for any single component?
The certified renovator is only required to use one lead test kit or paint chip sample for each component, even if the surface of the component is extensive (e.g., a large wall). Question Number: 23002-23865 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Can a homeowner use an EPA-recognized lead test kit to check for lead-based paint?
Answer: A number of lead test kits are available for consumer purchase in most retail hardware stores; however, the Consumer Product Safety Commission (CPSC) states that consumers should exercise caution when using these lead test kits to evaluate consumer products for potential lead exposures. Find more information online . To…
- Last published:
-
How can I obtain D-Lead® test kits?
The D-Lead® test kits are available for purchase from certain distributors and retail outlets. Locate a distributor or retailer online , email [email protected] or call 414-962-3006. Question Number: 23002-16390 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is lead paint testing required under the Lead Renovation, Repair and Painting (RRP) Rule?
No. A firm can either assume lead-based paint is present and follow the requirements of the RRP Rule (which requires no testing), or test and if lead-based paint is found follow the requirements of the regulation. Question Number: 23002-32338 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Are the trucks leaving the derailment site spreading contamination?
Each truck leaving the derailment site that is carrying contaminated waste is checked to ensure all material is safely secured. Also, all trucks go through a washing process before departing the site. The washing process ensures the vehicles’ wheels and undercarriage are free of dirt and mud. Street sweepers are…
- Last published:
-
What is the process for backfilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published: