Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Residential soil sampling and water testing Total results: 10
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Residential soil sampling and water testing
- Budget
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule
Displaying 1 - 15 of 42 results
-
Where can I find the East Palestine City Park soil sampling results?
You can find East Palestine City Park soil sampling results at: East Palestine City Park soil sampling results
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Is there one document available that includes the latest version of the Renovation, Repair, and Painting (RRP) Rule, with all amendments added to their associated locations, in complete form, and not including the preamble?
Answer: Yes. Visit the RRP Web site at https://www.epa.gov/lead/answers-frequent-questions-about-epas-lead-renovation-repair-and-painting-rrp-rule Question Number: 23002-19407 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
I am planning to renovate my home. How can I find a lead-safe certified firm?
EPA has a searchable database to help you locate lead-safe certified firms near you at: https://cdxapps.epa.gov/ocspp-oppt-lead/firm-location-search . In addition, you can call EPA's lead hotline at 1-800-424-LEAD (5323) if you have questions. Question Number: 23002-18044 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How much will it cost contractors to comply with the RRP Rule?
Answer: In order to comply with the RRP rule, renovators will incur costs for EPA certification and costs to take a training course from an EPA-accredited training provider, as well as for supplies needed in order to carry out the required lead-safe work practices designed to reduce exposure to lead…
- Last published:
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If there are differences among EPA's, HUD's, and my State's lead-safe work and housing requirements, which ones do I have to comply with?
You must comply with all applicable requirements. The initial 8-hour renovator training course will teach you how to perform lead-safe work practices safely and effectively in compliance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule and the Housing and Urban Development (HUD) Lead Safe Housing Rule. The RRP…
- Last published:
-
What records will my firm be required to keep to comply with the Renovation, Repair, and Painting Rule?
The following records must be retained for three years following the completion of a renovation: Reports (if any) certifying that lead-based paint is not present; Records relating to the distribution of the lead pamphlet; and Documentation of compliance with the requirements of the regulation ( EPA has prepared a sample…
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
What were the results from the phase 1 of soil sampling?
Phase 1 of soil sampling is complete, and we have received most of the preliminary data. The vast majority of results are within typical ranges for soil. Samples taken on private properties are all within typical soil levels, and only a few samples taken along public right-of-way (next to roads…
- Last published:
-
What are the next steps?
The sampling data will be evaluated to determine if additional sampling or other action is necessary (additional information will be made available soon). Evaluation of results and future sampling plans will guide EPA’s future work and environmental monitoring in the East Palestine area.
- Last published:
-
How were soil sample locations chosen?
The study area was determined based on evacuation zones, plume modeling, field observations, and areas most likely to be impacted by the vent and burn. Event Reconstruction Plume Map
- Last published: