Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the East Palestine Train Derailment Total results: 13
- Assistance with Child Care and Pets During Cleaning Total results: 2
- About the Cleaning Process Total results: 10
- After Cleaning Total results: 3
- Air testing Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Pre-Renovation Education Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- About the East Palestine Train Derailment
- Assistance with Child Care and Pets During Cleaning
- Pre-Renovation Education
Displaying 1 - 15 of 41 results
-
How does EPA oversee cleanup at the derailment site?
EPA leads the Unified Command consisting of different agencies to approve Norfolk Southern’s workplans and weekly activities. EPA also coordinates with other agencies to perform oversight, such as with Ohio EPA, the Columbiana County Health District, and the Pennsylvania Department of Environmental Protection. EPA and Ohio EPA personnel oversee safety…
- Last published:
-
What are the health agencies doing?
The Centers for Disease Control and Prevention and Agency for Toxic Substances and Disease Registry (ATSDR) are analyzing their Assessment of Chemical Exposure (ACE) survey results to assess the health impacts of the train derailment. CDC and ATSDR continue to support the Ohio and Pennsylvania health departments and will be…
- Last published:
-
Now that the track is rebuilt, what else needs to be done and how long will it take?
There is still a lot of work to do. Contaminated soil to the north and south of the tracks need to be removed. A full site assessment, including extensive sampling, of areas and properties near the derailment site needs to be conducted. A full assessment of impacted creeks will be…
- Last published:
-
If there is a government shutdown, will work continue on the cleanup?
A 45-day continuing resolution was recently passed to avoid a shutdown. EPA’s emergency response efforts, such as in East Palestine, would move forward under a lapse in appropriation. As a result, EPA personnel would continue to fully support those efforts during a lapse.
- Last published:
-
What is the process for refilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
May I use the pamphlet “Protect Your Family From Lead in Your Home” to meet my obligations for pre-renovation education under the RRP Rule?
Answer: No. As of December 22, 2008, only the pamphlet “ Renovate Right ” may be used to comply with the pre-renovation education requirements of the RRP Rule. “ Protect Your Family ” is still available for use during real-estate sales and lease transactions and for general information. Question Number…
- Last published:
-
My firm is replacing windows in a condominium. Is this type of exterior work considered work in a common area, and if so, must other owners and occupants be informed about the job?
Exterior renovations of multi-unit target housing are considered renovations of a common area. A common area is a portion of a building that is generally accessible to all residents or users of the building. Renovations in common areas of multi-unit target housing, such as condominiums, must be performed in accordance…
- Last published:
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
- Last published:
-
When multiple contractors are involved in a single renovation, must every contractor provide pre-renovation education? Can a certified firm assign its responsibility to a property management company?
All firms performing, offering or claiming to perform renovations are responsible for ensuring compliance with the pre-renovation education requirements of the RRP Rule. However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation. Accordingly, a firm may discharge the task by…
- Last published:
-
How do federal and state agencies get notified of a chemical or oil spill requiring an emergency response?
By law, companies or individuals who spill hazardous chemicals or oil are required to call the National Response Center (NRC) if the quantity is above reporting limits. The NRC then notifies federal, state and local responders. Most States have additional reporting requirements that are separate from the NRC.
- Last published:
-
I am planning on sending the pamphlet via certificate of mailing to a tenant who occupies a unit scheduled to be renovated. Does the tenant’s name need to be addressed on the mailing, or is it acceptable to address the envelope to Attn: Tenant/Occupant?
Answer: The tenant’s name and address must be indicated on the mailing. The RRP Rule requires a renovator to provide the “Renovate Right” pamphlet to an adult in each unit. Therefore, the name and address of an adult occupant in each unit must be indicated on the mailing. The renovator…
- Last published:
-
If working in target housing occupied by persons who are blind, how should a firm comply with the pre-renovation information distribution requirements?
EPA’s pamphlet titled Renovate Right: Important Lead Hazard Information for Families, Child Care Providers and Schools is currently not published in a Braille format. In addition to distributing the regular pamphlet, a firm working in such an environment should take extra precaution to ensure that the owner and occupants are…
- Last published:
-
If a firm completely blocks access to a common area for the duration of a renovation, does the renovator still have to provide notifications to all tenants?
When tenant accessibility to a work site within a common area can be precluded for the duration of a renovation, EPA considers that work site to be temporarily excluded from the common area of the building for pre-renovation education purposes because it is not accessible to the residents and users…
- Last published:
-
If a renovation is to be performed on a common area in a pre-1978 building that contains a mix of studio apartments (0-bedroom dwellings) and apartments with one or more bedrooms, what pre-renovation education requirements would apply?
With respect to apartments with 1 or more bedrooms, the renovator must provide written notification to an adult occupant of each dwelling no more than 60 days before any renovation activity commences. See 40 CFR 745.84(b)(2 ). As a reminder, notice of renovation activities in common areas may be provided…
- Last published:
-
If a project disturbs six square feet or less of interior surface or twenty square feet or less of exterior surface, is it necessary for a firm to comply with the pre-renovation education requirements, such as distributing the pamphlet?
No. A project that disturbs six square feet or less of interior painted surface or twenty square feet or less of exterior painted surface is not considered a "renovation" under the Rule. It is considered a minor maintenance and repair activity. As long as this type of disturbance does not…
- Last published: