Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Waste disposal and containment Total results: 13
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Renovator Certification and Training Total results: 12
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 26 results
-
How is waste leaving the derailment site tracked?
EPA on-scene coordinators are assigned to track liquid–and solid–waste trucks entering and leaving the derailment site. They log every truck, oversee the loading and covering of waste, truck washing and weighing, and the proper placement of placards. Responders take pictures throughout the process. All trucks go to approved and regulated…
- Last published:
-
What happens after the track work is completed?
The track work has been the highest priority to remove most contamination as early as possible. This, plus preventing the spread of contamination by capturing water from the site and constructing a bypass of Sulphur Run around the site will continue into June. While track work and water management continue…
- Last published:
-
What does the on-site wastewater treatment process on site entail?
EPA has approved a workplan to allow Norfolk Southern to treat hazardous wastewater on-site, removing vinyl chloride and other contaminants to dispose of the treated wastewater off-site as a non-hazardous waste. Currently, the train derailment site generates nearly one million gallons of wastewater per week from the collection of stormwater…
- Last published:
-
Where is the treated wastewater going?
The wastewater treatment system removes derailment contaminants using several steps, including sedimentation and filtration. The treated wastewater is then tested to verify vinyl chloride is below the drinking water standard. Once treated, water is sent to facilities certified to accept non-hazardous wastewater and that are regulated by federal and state…
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
Can renovator training courses, both initial and refresher courses, be taught online or via distance learning?
Answer: The final Renovation, Repair and Painting regulation, like the abatement program, permits the use of alternative training techniques (e.g., video training, computer-based training) as a supplement to the hands-on skills assessment, or as a substitute for the lecture portion of the training course requirements outlined in § 745.225. In…
- Last published:
-
How much waste was removed as part of the cleanup efforts?
In late October, EPA announced the completion of major derailment site excavation. Remaining contaminated soil and debris were removed for off-site treatment or disposal. Contact water continues to be treated in an on-site wastewater treatment system prior to removal for off-site disposal. As of November 13, over 174,000 tons of…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is the certified renovator assigned to a specific project responsible for the work practices of other contractors on the project if the certified renovator is an employee of the general contractor of the project?
All firms performing renovations must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator. A firm acting as a general contractor may satisfy this requirement by hiring another certified firm that takes responsibility for ensuring…
- Last published:
-
What about a situation where the homeowner is acting as their own general contractor and hires multiple companies to do different portions of the work? In this situation, would each business participating be required to follow the rules and assign a separate certified renovator to supervise their portion of the work including separate containment?
Answer: While the homeowner may be performing the role of general contractor by hiring firms and organizing their work, the homeowner is not performing, offering, or claiming to perform a renovation and therefore does not need to be a certified firm. The firms hired by the homeowner to perform renovation…
- Last published:
-
The certified renovator is required to have proof of their certification at the work site. If the certified renovator provides on-the-job training to workers, does there need to be documentation of that training at the work site too?
Answer: No. Certified renovators must have with them at the work site copies of their initial course completion certificate and their most recent refresher course completion certificate. Certified renovators are also responsible for providing training to non-certified workers on the work practices they will be using in performing their assigned…
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
Are the trucks leaving the derailment site spreading contamination?
Each truck leaving the derailment site that is carrying contaminated waste is checked to ensure all material is safely secured. Also, all trucks go through a washing process before departing the site. The washing process ensures the vehicles’ wheels and undercarriage are free of dirt and mud. Street sweepers are…
- Last published:
-
What is the process for backfilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
What are the large blue tanks at the derailment site?
As EPA continues overseeing cleanup work at the derailment site, two large blue lake tanks will reduce EPA’s on-site frac tank footprint. Frac tanks, for smaller quantities of liquid storage, have been used since the derailment to stage liquid before it is removed for off-site disposal.
- Last published: