Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 7 of 7 results
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated event. How long does such a building remain a child-occupied facility?
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated or rare event. How long does such a building remain a child-occupied facility? Answer: A building, or portion of a building, is…
- Last published:
-
If a building contains a child-occupied facility, must all renovations in the building follow the Lead Renovation, Repair and Painting (RRP) Rule?
Not necessarily. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within any week (Sunday through Saturday period), provided that each day’s visit lasts at least three hours…
- Last published:
-
What is a child-occupied facility?
Answer: A child-occupied facility is a building, or a portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within any week (Sunday through Saturday period), provided that each day's visit lasts at least three…
- Last published:
-
How will waste from the Further Remedial Elements project (Silver Bow Creek Corridor) areas be handled?
Each Further Remedial Element project area has its own specific requirements regarding waste. For example, at Northside Tailings and Diggings East, all materials within the project area that exceed the Waste Identification Criteria will be disposed of offsite in a repository. At Buffalo Gulch all materials below the basin(s) that…
- Last published:
-
Is a health care facility or hospital covered under the RRP Rule if it meets the definition of a child-occupied facility?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule defines a child-occupied facility as a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within any week (Sunday through Saturday period), provided…
- Last published: