Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Definition of "Renovation" Total results: 17
- Child-Occupied Facilities Total results: 5
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 32 results
-
How long will it take?
The expectation is for cleaning to take less than one day. The duration will be dependent on the size of the structure and the scope of work.
- Last published:
-
Do I need to leave my structure during the cleaning?
While it is strongly recommended that you leave the property during the cleaning, you are not required to do so.
- Last published:
-
What about cleaning basements or attics?
Basements or attics will be considered for cleaning if they are finished and habitable areas.
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Will there be photos and videos taken of my property?
Yes, photos and videos of your property will be taken as a requirement of the program. This is done to ensure that the conditions of the property both pre- and post-cleaning are documented thoroughly.
- Last published:
-
Are renovations that disturb stucco subject to the RRP Rule? Does it matter whether the stucco has been painted?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. Therefore, renovations that disturb stucco are subject to the RRP Rule only if the stucco has been painted. Question Number: 23002-14025 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are Department of Energy weatherization projects covered under the RRP Rule?
Answer : The Lead Renovation, Repair, and Painting (RRP) Rule defines “renovation” to include weatherization projects such as cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, and planing thresholds to install weather stripping. Other types of weatherization projects, such as window replacement, are…
- Last published:
-
If I am painting a wall on which there are multiple coats of latex paint over the old lead-based paint and the paint is not peeling down to the lead paint level must I comply with the new Renovation, Repair, and Painting (RRP) regulations?
Yes, if the painted surface of the wall will be disturbed by the renovation. Question Number: 23002-18485 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a homeowner removes all the painted surfaces in a room and then hires a certified firm to remodel the room, does the renovator need to follow the RRP Rule?
No. Projects that do not disturb a painted surface are not subject to the RRP Rule. Question Number: 23002-18301 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Who will conduct the cleaning?
Cleaning will be performed by workers contracted by Norfolk Southern who are trained and experienced with structure cleaning. Cleaning teams will wear the following: badges, identification clothing, safety vest, shoe covers, gloves (when appropriate for the task), and face coverings (upon request by the property owner or renter).
- Last published:
-
How can we be assured that this cleaning will remove any persistent hazardous material or substances?
Based on air monitoring and sampling conducted in and around the community, there is no evidence to suggest there is contamination of concern inside structures.
- Last published:
-
What RRP requirements apply to a comprehensive renovation project involving the removal and replacement of all interior painted surfaces from target housing or a child-occupied facility?
A project that involves the removal and replacement of all interior painted surfaces but leaves all exterior painted surfaces intact is considered a renovation for RRP purposes. Therefore, all requirements of the RRP Rule apply including, but not limited to, those for firm and renovator certification, containment, waste disposal, cleaning…
- Last published:
-
Does the RRP Rule apply to demolishing and disposing of the following types of structures?
Question: Does the RRP Rule apply to demolishing and disposing of: An entire pre-1978 home or building? An entire, non-attached free-standing structure on the same property such as a garage, shed, or gazebo? An attached but segregated section of pre-1978 home or building such as a sunroom, addition, two-story porch…
- Last published: