Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Definition of "Renovation" Total results: 17
- Child-Occupied Facilities Total results: 5
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 29 of 29 results
-
My firm has been hired to replace windows in a home built before 1978. The existing windows are mil-finish aluminum. Because we will not disturb a painted surface, is this activity subject to the Lead Renovation, Repair and Painting (RRP) ruling?
No. The activity described above does not disturb a painted surface. Therefore, the requirements of the RRP Rule do not apply. Question Number: 23002-31781 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is removing and replacing a furnace. The surface area of the old furnace exceeds six square feet. Does the RRP Rule apply to this activity?
The RRP Rule applies to modifications of an existing structure, or portions thereof, that result in the disturbance of painted surfaces. Fixtures such as furnaces, radiators and heating elements, as opposed to personal property, are part of existing structures for RRP purposes. In this case, if the surface coating of…
- Last published:
-
My firm replaces garage doors. We unbolt the door from its hardware and remove it without penetrating, scraping, or removing paint. Is this work subject to the RRP Rule?
Answer: If unbolting and removing the door does not disturb a painted surface in the hinges, door, or frame, the Lead Renovation, Repair, and Painting (RRP) Rule does not apply. For more information on what types of activities disturb paint, go to the following question: 23002-14867 . Question Number: 23002-19760…
- Last published:
-
My firm was hired to scrape and repaint siding on a pre-1978 home. The siding is relatively new and was installed after 1978, but was nailed over top of the old lead-based exterior paint. Does the Lead Renovation, Repair and Painting (RRP) Rule apply?
Yes. The RRP Rule applies to a renovation in target housing unless it has been determined that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligram per square centimeter (mg/cm2) or 0.5% by weight…
- Last published:
-
What projects has EPA been involved with in Butte related to the Superfund site?
A variety of actions and activities have been implemented to address the contamination in Butte, including: Assessments of risk have been conducted to quantify actual and potential human health risks due to potential exposure to tailings, waste rock, yard soils, indoor dust, attic dust, mercury vapor, surface water, and ground…
- Last published:
-
What does the Confidentiality Order not cover?
The Order does not apply to technical documents, discussions, and meetings concerning the implementation of the consent decrees that occur after the Court entered the consent decrees.
- Last published:
-
What work are the potentially responsible parties required to complete at Butte Priority Soils Operable Unit?
EPA will conduct oversight in consultation with the Montana Department of Environmental Quality (MDEQ) on all work to be implemented by Atlantic Richfield and Butte-Silver Bow County. Atlantic Richfield will perform work in the Butte Reduction Works, Northside Tailings, Diggings East, Buffalo Gulch, East Buffalo Gulch, and Grove Gulch areas…
- Last published:
-
Does the RRP Rule apply to removing a roof that is not painted?
The RRP Rule applies to work that disturbs painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15689 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is the Confidentiality Order still in effect?
Yes. The Order states that all settlement discussions and documents “shall be kept confidential both during and after the negotiations and not disclosed to third persons.” (Order at 1-2).
- Last published:
-
What does the Confidentiality Order cover?
The Confidentiality Order applies to: All settlement discussions among and between the parties and any third parties. . .in settlement negotiations conducted pursuant to the Streamside Tailings Consent Decree settlement framework, as well as all documents prepared for settlement purposes or exchanged by the participants in such negotiations, shall be…
- Last published:
-
Who is covered by the Confidentiality Order?
Atlantic Richfield Company, Butte-Silver Bow County, the United States, the State of Montana, (including the Department of Environmental Quality and the Natural Resource Damage Program), and any third parties who join them in settlement negotiations.
- Last published:
-
Why are the potentially responsible parties at the site allowed to help design the cleanup plan?
EPA has a longstanding policy to pursue "enforcement first" throughout the Superfund cleanup process. Existing EPA guidance emphasizes that a major component of the "enforcement first" policy is that potentially responsible parties should conduct remedial actions whenever possible. Under the existing Consent Decree, the potentially responsible parties (PRPs) are required…
- Last published:
-
Can you list specific activities deemed a disturbance of painted surfaces?
Answer: As a general matter, EPA believes that activities that create dust or paint chips are activities that disturb paint. There is no definitive list of activities that disturb painted surfaces. Some examples that can disturb painted surfaces include, but are not limited to: - Making cut-outs in walls. -…
- Last published:
-
What is a “whole house gut rehabilitation project” for Lead Renovation, Repair and Painting (RRP) Rule purposes? If target housing has, at some point after 1978, been gut-rehabbed, would the RRP Rule apply to subsequent renovations on the property?
The phrase “gut rehabilitation” may have different meanings across the construction industry. EPA, however, used the phrase “whole house gut rehabilitation” in a very limited sense to describe only those activities that demolish and rebuild a structure to a point where it is effectively new construction. At a minimum, these…
- Last published: