Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Emergency Renovations Total results: 5
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 10 of 10 results
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
Does the RRP rule apply to contractors working on homes damaged by a hurricane or other natural disaster?
Damage from a major storm or other natural disaster could result in the need for emergency renovations. Certain requirements of the RRP Rule do not apply to emergency renovations, which are renovation activities that were not planned but result from a sudden, unexpected event that, if not immediately attended to…
- Last published:
-
What is the key question EPA tries to answer through a site investigation?
Findings of the site investigation determine what hazardous substances may be present, whether they may be released to the environment, and any potential threat to human health. Information about the site that is collected in the preliminary assessment and site investigation phase helps EPA to evaluate the risks posed by…
- Last published:
-
How do I know if a child has an Elevated Blood Level (EBL) prior to my work if he or she hasn't had their blood lead tested recently?
Answer: It is never the renovation firm’s responsibility to determine whether a child has an elevated blood lead (EBL) level. Question Number: 23002-16822 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
According to your guidelines emergency projects are exempt from some requirements to the extent necessary to respond to the emergency. Does this mean that my firm does not need to be certified and my company doesn't need a certified renovator?
Question : My company only does emergency renovation work. According to your guidelines emergency projects are exempt from the warning sign, containment, waste handling, training, and certification requirements to the extent necessary to respond to the emergency. Emergency renovations are NOT exempt from the cleaning and cleaning verification requirements. Does…
- Last published:
-
What is an "emergency renovation" for purposes of the Lead Renovation, Repair and Painting (RRP) Rule?
Emergency renovations are those performed in response to situations necessitating immediate action to address safety or public health hazards or threats of significant damage to equipment and/or property. The need for immediate action relieves firms from the pre-renovation education requirements. Likewise, emergency renovations are exempt from the warning sign, containment…
- Last published: