Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- In General Total results: 9
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 26 results
-
What if there is a gap in coverage of the GLEJGP?
EPA has set up national technical assistance centers (TCTACs), including one solely for tribes and tribal nations, that are geared towards communities. There are two in Region 5: one in Minneapolis and one in Chicago. The TCTACs are separate from this RFA ; however, they cover the entire Great Lakes…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does EPA have a minimum threshold/definition for the Regional scale program? In other words, what does Regional mean or is it open to applicants to determine at any scale?
GLNPO wants to be extremely flexible and encourage PRs to think about which regions they could expect to effectively cover when creating their application. There are no additional criteria from EPA on how big or small the Project RFA should be.
- Last published:
-
Can I get gas at Leake Oil on Taggart Street?
No, Leake Oil is currently closed due to site activities. They have an alternate location on N. Market Street.
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published:
-
My firm repairs windows by removing and replacing the sash. We may disturb paint on the hinges and screws, but do not otherwise disturb a painted surface. Is this work subject to the Lead Renovation, Repair and Painting (RRP) Rule?
Replacement of a window sash by simply unscrewing hinges or releasing it from a jambliner does not constitute "window replacement" for purposes of the RRP Rule . Therefore, such tasks may fit within the definition of minor repair and maintenance i.e., activities that disturb six square feet or less of…
- Last published:
-
Will air monitoring continue around Taggart Street?
Stationary and mobile air monitoring continues around the community and within the derailment site. As the excavation work is completed and remaining waste removed, air monitoring will be reduced.
- Last published:
-
Can I walk along Taggart Street?
Pedestrians are discouraged from walking on Taggart Street for safety reasons. Heavy equipment and truck traffic are still present, and there are no sidewalks along some stretches of the street.
- Last published: